6317 East Sharp Avenue, Spokane, WA 99212
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Yellowstone Pipeline | North Spokane P66, Spokane County, WA | gasoline distillate jet fuel | confirmed | FERC No. 125.24.0; FERC No. 124.22.0; FERC No. 123.23.0 |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Tesoro Corporation's Spokane (Hillyard) Station WA | Yellowstone Pipeline | junction or tank farm | 4.94 | FERC No. 124.22.0 |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA WA | Yellowstone Pipeline | junction or tank farm | 12.31 | FERC No. 123.23.0 |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) MT | Yellowstone Pipeline | junction or tank farm | 125.78 | FERC No. 125.24.0 |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Tesoro Corporation's Spokane on Yellowstone Pipeline to North Spokane P66, Spokane County, WA (FERC No. 124.22.0 item Table of Rates).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 0.118 | published | Yellowstone Pipeline FERC No. 124.22.0 item Table of Rates: Tesoro Corporation's Spokane (Hillyard) Station → North Spokane P66, Spokane County, WA, 4.94 ¢/bbl |
| Carrying cost | 0.297 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 7.518 days (0.018 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 2 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.122 | published | Yellowstone Pipeline Item 6 of the tariff, tender deduction: 0.05% of volume at $2.4300/gal = 5.10 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 2.036 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (3 of 3). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Tesoro Corporation's Spokane (Hillyard) Station | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 0.12 | 0.30 | 0.12* | 1.50 | 2.04 | 7.5 | — | FERC No. 124.22.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 0.29 | 0.30 | 0.24 | 1.50 | 2.33 | 7.5 | 0.30 | FERC No. 123.23.0 item Table of Rates |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 2.99 | 0.30 | 0.12* | 1.50 | 4.91 | — | 2.88 | FERC No. 125.24.0 item Table of Rates |
Route used: from Tesoro Corporation's Spokane on Yellowstone Pipeline to North Spokane P66, Spokane County, WA (FERC No. 124.22.0 item Table of Rates).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 0.118 | published | Yellowstone Pipeline FERC No. 124.22.0 item Table of Rates: Tesoro Corporation's Spokane (Hillyard) Station → North Spokane P66, Spokane County, WA, 4.94 ¢/bbl |
| Carrying cost | 0.455 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 7.518 days (0.018 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 2 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.186 | published | Yellowstone Pipeline Item 6 of the tariff, tender deduction: 0.05% of volume at $3.7200/gal = 7.81 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 2.259 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (3 of 3). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Tesoro Corporation's Spokane (Hillyard) Station | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 0.12 | 0.46 | 0.19* | 1.50 | 2.26 | 7.5 | — | FERC No. 124.22.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 0.29 | 0.46 | 0.37 | 1.50 | 2.62 | 7.5 | 0.36 | FERC No. 123.23.0 item Table of Rates |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | 2.99 | 0.45 | 0.19* | 1.50 | 5.13 | — | 2.88 | FERC No. 125.24.0 item Table of Rates |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-24 | Diesel | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.25 | carrying cost −0.04¢; pipeline loss −0.02¢ |
| 2026-11-24 | Gasoline | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.03 | carrying cost −0.01¢; pipeline loss −0.01¢ |
| 2026-11-17 | Diesel | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.31 | carrying cost −0.03¢; pipeline loss −0.01¢ |
| 2026-11-17 | Gasoline | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.05 | carrying cost −0.01¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.35 | first snapshot |
| 2026-11-16 | Gasoline | Tesoro Corporation's Spokane · Yellowstone Pipeline | 2.07 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| PAR Montana - Spokane WA T-91-WA-4411 | Spokane, WA | 0.2 | unknown |
| Holly Energy Partners - Operating L.P. T-91-WA-4412 | Spokane, WA | 4.7 | gasoline distillate jet fuel |
| ConocoPhillips - Moses Lake T-91-WA-4401 | Moses Lake, WA | 97.5 | gasoline distillate jet fuel |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.