#104 of 422 U.S. rack markets by terminals
| Terminal | TCN | Location | Delivered by |
|---|---|---|---|
| ConocoPhillips - Spokane | T-91-WA-4410 | Spokane, WA | Yellowstone Pipeline |
| Holly Energy Partners - Operating L.P. | T-91-WA-4412 | Spokane, WA | Tesoro Northwest Products Pipeline, Yellowstone Pipeline |
| PAR Montana - Spokane WA | T-91-WA-4411 | Spokane, WA | no pipeline tariff on file |
Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.
| Pipeline system | Terminals here | Delivery points | Refineries confirmed | All reachable |
|---|---|---|---|---|
| Yellowstone Pipeline | 2 | 2 | 0 | 0 |
| Tesoro Northwest Products Pipeline | 1 | 1 | 0 | 0 |
No refinery has a published pipeline route here on file.
| County | State | Share here | People counted here | Gasoline gal/day | Diesel gal/day | County population | Miles |
|---|---|---|---|---|---|---|---|
| Spokane County | WA | 100% | 558,344 | 397,087 | 102,863 | 558,344 | 6 |
| Kootenai County | ID | 100% | 191,864 | 224,439 | 80,997 | 191,864 | 31 |
| Bonner County | ID | 100% | 54,420 | 65,284 | 30,018 | 54,420 | 55 |
| Stevens County | WA | 100% | 49,668 | 39,067 | 12,659 | 49,668 | 54 |
| Whitman County | WA | 100% | 48,512 | 42,831 | 12,502 | 48,512 | 55 |
| Latah County | ID | 100% | 41,842 | 35,114 | 12,641 | 41,842 | 67 |
| Nez Perce County | ID | 38% | 16,377 | 22,089 | 7,957 | 42,905 | 98 |
| Lincoln County | MT | 66% | 14,757 | 15,797 | 6,995 | 22,328 | 105 |
| Pend Oreille County | WA | 100% | 14,457 | 14,365 | 4,717 | 14,457 | 59 |
| Boundary County | ID | 100% | 13,997 | 18,194 | 7,369 | 13,997 | 80 |
| Okanogan County | WA | 23% | 10,606 | 12,071 | 3,837 | 45,230 | 126 |
| Benewah County | ID | 100% | 10,508 | 18,445 | 7,306 | 10,508 | 46 |
| Shoshone County | ID | 67% | 9,487 | 17,131 | 10,546 | 14,130 | 72 |
| Lincoln County | WA | 61% | 7,323 | 19,113 | 8,159 | 11,982 | 51 |
| Sanders County | MT | 44% | 6,170 | 8,665 | 4,223 | 14,062 | 100 |
| Asotin County | WA | 27% | 5,999 | 2,841 | 752 | 22,545 | 104 |
| Ferry County | WA | 72% | 5,441 | 8,594 | 2,487 | 7,517 | 77 |
| Clearwater County | ID | 40% | 3,666 | 4,634 | 1,791 | 9,118 | 106 |
| Wallowa County | OR | 17% | 1,319 | 834 | 672 | 7,595 | 145 |
| Lewis County | ID | 34% | 1,271 | 3,288 | 1,358 | 3,704 | 109 |
| Garfield County | WA | 27% | 664 | 1,534 | 615 | 2,416 | 88 |
Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.
How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Tesoro Corporation's Spokane on Yellowstone Pipeline to North Spokane P66, Spokane County, WA (FERC No. 124.22.0 item Table of Rates).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 0.118 | published | Yellowstone Pipeline FERC No. 124.22.0 item Table of Rates: Tesoro Corporation's Spokane (Hillyard) Station → North Spokane P66, Spokane County, WA, 4.94 ¢/bbl |
| Carrying cost | 0.302 | calculated | $2.470000/gal × 5.9400% ÷ 365 × 7.518 days (0.018 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 2 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.124 | published | Yellowstone Pipeline Item 6 of the tariff, tender deduction: 0.05% of volume at $2.4700/gal = 5.19 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 2.043 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (6 of 6). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Tesoro Corporation's Spokane (Hillyard) Station | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 0.12 | 0.30 | 0.12* | 1.50 | 2.04 | 7.5 | — | FERC No. 124.22.0 item Table of Rates |
| North Spokane P66, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | Holly Energy Partners - Operating L.P. | 0.12 | 0.30 | 0.25 | 1.50 | 2.17 | 7.6 | 0.13 | FERC No. 123.23.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 0.29 | 0.30 | 0.25 | 1.50 | 2.34 | 7.5 | 0.30 | FERC No. 123.23.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | Holly Energy Partners - Operating L.P. | 0.41 | 0.30 | 0.25 | 1.50 | 2.46 | 7.5 | 0.42 | FERC No. 123.23.0 item Table of Rates |
| Pasco Station | Tesoro Northwest Products Pipeline | Spokane Station | Holly Energy Partners - Operating L.P. | 1.74 | 0.36 | 0.25 | 1.50 | 3.86 | 9.1 | 1.81 | F.E.R.C. No. 2.19.0 |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 2.99 | 0.30 | 0.12* | 1.50 | 4.92 | — | 2.88 | FERC No. 125.24.0 item Table of Rates |
Route used: from Tesoro Corporation's Spokane on Yellowstone Pipeline to North Spokane P66, Spokane County, WA (FERC No. 124.22.0 item Table of Rates).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 0.118 | published | Yellowstone Pipeline FERC No. 124.22.0 item Table of Rates: Tesoro Corporation's Spokane (Hillyard) Station → North Spokane P66, Spokane County, WA, 4.94 ¢/bbl |
| Carrying cost | 0.463 | calculated | $3.780000/gal × 5.9400% ÷ 365 × 7.518 days (0.018 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 2 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.189 | published | Yellowstone Pipeline Item 6 of the tariff, tender deduction: 0.05% of volume at $3.7800/gal = 7.94 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 2.269 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (6 of 6). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Tesoro Corporation's Spokane (Hillyard) Station | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 0.12 | 0.46 | 0.19* | 1.50 | 2.27 | 7.5 | — | FERC No. 124.22.0 item Table of Rates |
| North Spokane P66, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | Holly Energy Partners - Operating L.P. | 0.12 | 0.46 | 0.38 | 1.50 | 2.46 | 7.6 | 0.19 | FERC No. 123.23.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 0.29 | 0.46 | 0.38 | 1.50 | 2.63 | 7.5 | 0.36 | FERC No. 123.23.0 item Table of Rates |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | Holly Energy Partners - Operating L.P. | 0.41 | 0.46 | 0.38 | 1.50 | 2.75 | 7.5 | 0.48 | FERC No. 123.23.0 item Table of Rates |
| Pasco Station | Tesoro Northwest Products Pipeline | Spokane Station | Holly Energy Partners - Operating L.P. | 1.74 | 0.56 | 0.38 | 1.50 | 4.18 | 9.1 | 1.91 | F.E.R.C. No. 2.19.0 |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | ConocoPhillips - Spokane | 2.99 | 0.46 | 0.19* | 1.50 | 5.15 | — | 2.88 | FERC No. 125.24.0 item Table of Rates |
| Origin | Pipeline | Delivery point | Product | ¢/bbl | ¢/gal | Refineries at the origin | Tariff |
|---|---|---|---|---|---|---|---|
| North Spokane P66, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | gasoline, distillate, jet fuel | 4.94 | 0.12 | FERC No. 123.23.0 item Table of Rates | |
| Tesoro Corporation's Spokane (Hillyard) Station | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | gasoline, distillate, jet fuel | 4.94 | 0.12 | FERC No. 124.22.0 item Table of Rates | |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | gasoline, distillate, jet fuel | 12.31 | 0.29 | FERC No. 123.23.0 item Table of Rates | |
| Yellowstone Pipe Line Company's Spokane (Parkwater) Delivery Station, Spokane County, WA | Yellowstone Pipeline | North Spokane-Hillyard (Holly), Spokane County, WA | gasoline, distillate, jet fuel | 17.18 | 0.41 | FERC No. 123.23.0 item Table of Rates | |
| Pasco Station | Tesoro Northwest Products Pipeline | Spokane Station | gasoline, jet, distillate | 73.24 | 1.74 | F.E.R.C. No. 2.19.0 | |
| Thompson Falls, Sanders County, MT (re-injection point after rail around the Flathead Reservation) | Yellowstone Pipeline | North Spokane P66, Spokane County, WA | gasoline, distillate, jet fuel | 125.78 | 3.00 | FERC No. 125.24.0 item Table of Rates |
Two pipeline systems deliver here: one can cover for the other where a terminal is on both.
| Pipeline system | Terminals it reaches here | With no other pipeline | Which |
|---|---|---|---|
| Yellowstone Pipeline | 2 | 1 | ConocoPhillips - Spokane |
| Tesoro Northwest Products Pipeline | 1 | 0 |
Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.