1840 Lyell Avenue, Rochester, NY 14606
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Sunoco / Energy Transfer | Rochester, Monroe County | gasoline distillate | confirmed | FERC No. 175.36.0; 215.13.0; 216.18.0 |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Caledonia (Buckeye) NY | Sunoco / Energy Transfer | junction or tank farm | 30.42 | FERC No. 175.36.0 |
| Montello (Laurel Pipeline) PA | Sunoco / Energy Transfer | junction or tank farm | 257.49 | FERC No. 175.36.0 |
| Point Breeze PA | Sunoco / Energy Transfer | junction or tank farm | 296.86 | FERC No. 175.36.0 |
| Twin Oaks PA | Sunoco / Energy Transfer | junction or tank farm | 297.03 | FERC No. 175.36.0 |
| Eagle Point NJ | Sunoco / Energy Transfer | junction or tank farm | 297.03 | FERC No. 175.36.0 |
| Fostoria Station OH | Sunoco / Energy Transfer uncommitted | junction or tank farm | 582.84 | FERC No. 215.13.0 |
| Toledo OH | Sunoco / Energy Transfer uncommitted |
Bp-Husky Refining LLC Toledo Refining CO LLC |
619.17 | FERC No. 216.18.0 |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Point Breeze on Sunoco / Energy Transfer to Rochester, Monroe County (FERC No. 175.36.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 7.068 | published | Sunoco / Energy Transfer FERC No. 175.36.0: Point Breeze → Rochester, Monroe County, 296.86 ¢/bbl |
| Carrying cost | 0.410 | calculated | $2.390000/gal × 5.9200% ÷ 365 × 10.581 days (3.081 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 296 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.239 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 9.217 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (7 of 7). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Point Breeze | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.41 | 0.24 | 1.50 | 9.22 | 10.6 | — | FERC No. 175.36.0 |
| Twin Oaks | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.41 | 0.24 | 1.50 | 9.22 | 10.6 | 0.00 | FERC No. 175.36.0 |
| Eagle Point | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.41 | 0.24 | 1.50 | 9.22 | 10.6 | 0.01 | FERC No. 175.36.0 |
| Chelsea Jct. | Buckeye Pipeline, then at Montello: Sunoco / Energy Transfer two pipelines | Rochester, Monroe County | 7.08 | 0.51 | 0.48 | 1.50 | 9.57 | 13.1 | 0.35 | FERC No. 442.42.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Booth | Buckeye Pipeline, then at Caledonia: Sunoco / Energy Transfer two pipelines | Rochester, Monroe County | 8.18 | 0.51 | 0.48 | 1.50 | 10.67 | 13.2 | 1.45 | FERC No. 441.24.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Fostoria Station | Sunoco / Energy Transfer | Rochester, Monroe County | 13.88 | 0.44 | 0.24 | 1.50 | 16.06 | 11.4 | 6.84 | FERC No. 215.13.0 |
| Toledo | Sunoco / Energy Transfer | Rochester, Monroe County | 14.74 | 0.44 | 0.24 | 1.50 | 16.92 | 11.3 | 7.70 | FERC No. 216.18.0 |
Route used: from Point Breeze on Sunoco / Energy Transfer to Rochester, Monroe County (FERC No. 175.36.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 7.068 | published | Sunoco / Energy Transfer FERC No. 175.36.0: Point Breeze → Rochester, Monroe County, 296.86 ¢/bbl |
| Carrying cost | 0.633 | calculated | $3.690000/gal × 5.9200% ÷ 365 × 10.581 days (3.081 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 296 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.369 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 9.570 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (7 of 7). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Point Breeze | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.63 | 0.37 | 1.50 | 9.57 | 10.6 | — | FERC No. 175.36.0 |
| Twin Oaks | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.63 | 0.37 | 1.50 | 9.57 | 10.6 | 0.00 | FERC No. 175.36.0 |
| Eagle Point | Sunoco / Energy Transfer | Rochester, Monroe County | 7.07 | 0.64 | 0.37 | 1.50 | 9.58 | 10.6 | 0.01 | FERC No. 175.36.0 |
| Chelsea Jct. | Buckeye Pipeline, then at Montello: Sunoco / Energy Transfer two pipelines | Rochester, Monroe County | 7.08 | 0.79 | 0.74 | 1.50 | 10.10 | 13.1 | 0.53 | FERC No. 442.42.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Booth | Buckeye Pipeline, then at Caledonia: Sunoco / Energy Transfer two pipelines | Rochester, Monroe County | 8.18 | 0.79 | 0.74 | 1.50 | 11.20 | 13.2 | 1.63 | FERC No. 441.24.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Fostoria Station | Sunoco / Energy Transfer | Rochester, Monroe County | 13.88 | 0.68 | 0.37 | 1.50 | 16.43 | 11.4 | 6.86 | FERC No. 215.13.0 |
| Toledo | Sunoco / Energy Transfer | Rochester, Monroe County | 14.74 | 0.67 | 0.37 | 1.50 | 17.29 | 11.3 | 7.72 | FERC No. 216.18.0 |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-17 | Diesel | Point Breeze · Sunoco / Energy Transfer | 9.67 | carrying cost −0.04¢; pipeline loss −0.02¢ |
| 2026-11-17 | Gasoline | Point Breeze · Sunoco / Energy Transfer | 9.25 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Point Breeze · Sunoco / Energy Transfer | 9.73 | first snapshot |
| 2026-11-16 | Gasoline | Point Breeze · Sunoco / Energy Transfer | 9.28 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| Petroleum Fuel & Terminal - Gates T-16-NY-1494 | Rochester, NY | 0.4 | gasoline distillate |
| Buckeye Terminals, LLC - Rochester T-16-NY-1469 | Rochester, NY | 0.4 | gasoline distillate |
| Sunoco, LLC T-16-NY-1470 | Rochester, NY | 0.8 | gasoline distillate |
| United Refining Co. - Rochester T-16-NY-1474 | Rochester, NY | 1.8 | distillate gasoline |
| Buckeye Terminals, LLC - Rochester T-16-NY-1468 | Rochester, NY | 2.9 | gasoline distillate |
| Buckeye Terminals, LLC - Rochester II T-16-NY-1472 | Rochester, NY | 3.0 | jet fuel |
| Buckeye Terminals, LLC - Buffalo T-16-NY-1458 | Buffalo, NY | 62.1 | gasoline distillate |
| United Refining Co. - Tonawanda T-16-NY-1457 | Tonawanda, NY | 64.3 | distillate gasoline |
| Energy Transfer Marketing & Terminals L.P. T-16-NY-1484 | Tonawanda, NY | 64.4 | gasoline distillate |
| Marathon Towanda T-16-NY-1459 | Tonawanda, NY | 64.4 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-16-NY-1476 | Warners, NY | 69.4 | gasoline distillate |
| Buckeye Terminals, LLC - Brewerton T-16-NY-1456 | Brewerton, NY | 74.5 | gasoline distillate |
| Sunoco, LLC T-16-NY-1471 | Big Flats, NY | 80.5 | gasoline distillate kerosene |
| American Refining - Bradford T-23-PA-1764 | Bradford, PA | 95.2 | gasoline distillate |
By truck direct from Western New York Energy LLC (Medina, NY), about 42 road miles.
Assumptions: TOE (Round 2 adders, realistic transit)
| Cost line | ¢/gal | How |
|---|---|---|
| Basis | +3.00 | table · Origin-state discount to Chicago |
| Truck freight | +2.10 | estimated · 42 road mi × $4/loaded mi ÷ 8,000 gal |
| Wholesale margin | +0.00 | flat |
| Terminal charge | +1.15 | flat · Terminaling estimate |
| Carrying cost | +0.00 | calculated |
| Delivered over CHI | +6.25 |