3351 St Route 352, P.O. Box 443, Big Flats, NY 14814
As published by Sunoco LP, effective 2026-09-28. Check with the terminal for current availability.
Source: Sunoco LP operations map
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Sunoco / Energy Transfer | Big Flats, Chemung County | gasoline distillate | confirmed | FERC No. 175.36.0; FERC No. 215.13.0; FERC No. 216.18.0 |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Montello (Laurel Pipeline) PA | Sunoco / Energy Transfer | junction or tank farm | 205.79 | FERC No. 175.36.0 |
| Point Breeze PA | Sunoco / Energy Transfer | junction or tank farm | 222.94 | FERC No. 175.36.0 |
| Twin Oaks PA | Sunoco / Energy Transfer | junction or tank farm | 223.13 | FERC No. 175.36.0 |
| Eagle Point NJ | Sunoco / Energy Transfer | junction or tank farm | 223.13 | FERC No. 175.36.0 |
| Fostoria Station OH | Sunoco / Energy Transfer uncommitted | junction or tank farm | 536.43 | FERC No. 215.13.0 |
| Toledo OH | Sunoco / Energy Transfer uncommitted |
Bp-Husky Refining LLC Toledo Refining CO LLC |
577.79 | FERC No. 216.18.0 |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Point Breeze on Sunoco / Energy Transfer to Big Flats, Chemung County (FERC No. 175.36.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 5.308 | published | Sunoco / Energy Transfer FERC No. 175.36.0: Point Breeze → Big Flats, Chemung County, 222.94 ¢/bbl |
| Carrying cost | 0.380 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 9.620 days (2.120 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 204 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 7.432 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (6 of 6). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Point Breeze | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.38 | 0.24 | 1.50 | 7.43 | 9.6 | — | FERC No. 175.36.0 |
| Twin Oaks | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.38 | 0.24 | 1.50 | 7.44 | 9.6 | 0.00 | FERC No. 175.36.0 |
| Eagle Point | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.38 | 0.24 | 1.50 | 7.44 | 9.7 | 0.01 | FERC No. 175.36.0 |
| Chelsea Jct. | Buckeye Pipeline, then at Montello: Sunoco / Energy Transfer two pipelines | Big Flats, Chemung County | 5.85 | 0.48 | 0.49 | 1.50 | 8.32 | 12.2 | 0.88 | FERC No. 442.42.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Fostoria Station | Sunoco / Energy Transfer | Big Flats, Chemung County | 12.77 | 0.46 | 0.24 | 1.50 | 14.97 | 11.6 | 7.54 | FERC No. 215.13.0 |
| Toledo | Sunoco / Energy Transfer | Big Flats, Chemung County | 13.76 | 0.46 | 0.24 | 1.50 | 15.96 | 11.5 | 8.52 | FERC No. 216.18.0 |
Route used: from Point Breeze on Sunoco / Energy Transfer to Big Flats, Chemung County (FERC No. 175.36.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 5.308 | published | Sunoco / Energy Transfer FERC No. 175.36.0: Point Breeze → Big Flats, Chemung County, 222.94 ¢/bbl |
| Carrying cost | 0.582 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 9.620 days (2.120 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 204 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 7.763 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (6 of 6). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Point Breeze | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.58 | 0.37 | 1.50 | 7.76 | 9.6 | — | FERC No. 175.36.0 |
| Twin Oaks | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.58 | 0.37 | 1.50 | 7.77 | 9.6 | 0.00 | FERC No. 175.36.0 |
| Eagle Point | Sunoco / Energy Transfer | Big Flats, Chemung County | 5.31 | 0.59 | 0.37 | 1.50 | 7.77 | 9.7 | 0.01 | FERC No. 175.36.0 |
| Chelsea Jct. | Buckeye Pipeline, then at Montello: Sunoco / Energy Transfer two pipelines | Big Flats, Chemung County | 5.85 | 0.74 | 0.74 | 1.50 | 8.83 | 12.2 | 1.07 | FERC No. 442.42.0 + FERC No. 175.36.0 effective 2025: check for a newer filing |
| Fostoria Station | Sunoco / Energy Transfer | Big Flats, Chemung County | 12.77 | 0.70 | 0.37 | 1.50 | 15.35 | 11.6 | 7.58 | FERC No. 215.13.0 |
| Toledo | Sunoco / Energy Transfer | Big Flats, Chemung County | 13.76 | 0.70 | 0.37 | 1.50 | 16.33 | 11.5 | 8.57 | FERC No. 216.18.0 |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-24 | Diesel | Point Breeze · Sunoco / Energy Transfer | 7.75 | carrying cost −0.05¢; pipeline loss −0.04¢ |
| 2026-11-24 | Gasoline | Point Breeze · Sunoco / Energy Transfer | 7.42 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-17 | Diesel | Point Breeze · Sunoco / Energy Transfer | 7.84 | carrying cost −0.04¢; pipeline loss −0.02¢ |
| 2026-11-17 | Gasoline | Point Breeze · Sunoco / Energy Transfer | 7.45 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Point Breeze · Sunoco / Energy Transfer | 7.90 | first snapshot |
| 2026-11-16 | Gasoline | Point Breeze · Sunoco / Energy Transfer | 7.48 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| Buckeye Terminals, LLC - Vestal T-16-NY-1488 | Vestal, NY | 49.3 | gasoline distillate |
| CITGO - Vestal T-16-NY-1454 | Vestal, NY | 49.6 | gasoline distillate |
| Superior Plus Energy Services Inc - Montoursville T-23-PA-1709 | Montoursville, PA | 60.7 | gasoline distillate |
| Sunoco Midstream LLC T-23-PA-1749 | Williamsport, PA | 61.3 | gasoline distillate |
| Buckeye Terminals, LLC - South Williamsport T-23-PA-1743 | South Williamsport, PA | 61.3 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-16-NY-1476 | Warners, NY | 75.1 | gasoline distillate |
| Buckeye Terminals, LLC - Rochester T-16-NY-1468 | Rochester, NY | 77.5 | gasoline distillate |
| Buckeye Terminals, LLC - Rochester II T-16-NY-1472 | Rochester, NY | 77.6 | jet fuel |
| United Refining Co. - Rochester T-16-NY-1474 | Rochester, NY | 78.7 | distillate gasoline |
| Sunoco, LLC T-16-NY-1470 | Rochester, NY | 79.6 | gasoline distillate |
| Petroleum Fuel & Terminal - Gates T-16-NY-1494 | Rochester, NY | 80.2 | gasoline distillate |
| Buckeye Terminals, LLC - Rochester T-16-NY-1469 | Rochester, NY | 80.3 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-16-NY-1473 | Rochester, NY | 80.5 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-23-PA-1720 | Edwardsville, PA | 81.2 | gasoline distillate |
| Lucknow-Highspire Terminals - Northland T-23-PA-1728 | Northumberland, PA | 82.0 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-23-PA-1729 | Northumberland, PA | 82.0 | gasoline distillate |
| Sunoco Midstream LLC T-23-PA-1703 | Pittston Township, PA | 84.4 | gasoline distillate |
| Lucknow-Highspire Terminals- Du Pont T-23-PA-1707 | Pittston, PA | 84.5 | gasoline distillate |
| Buckeye Terminals, LLC - Brewerton T-16-NY-1456 | Brewerton, NY | 85.1 | gasoline distillate |
| American Refining - Bradford T-23-PA-1764 | Bradford, PA | 85.8 | gasoline distillate |
By truck direct from Western New York Energy LLC (Medina, NY), about 124 road miles.
Assumptions: TOE (Round 2 adders, realistic transit)
| Cost line | ¢/gal | How |
|---|---|---|
| Basis | +3.00 | table · Origin-state discount to Chicago |
| Truck freight | +6.20 | estimated · 124 road mi × $4/loaded mi ÷ 8,000 gal |
| Wholesale margin | +0.00 | flat |
| Terminal charge | +1.15 | flat · Terminaling estimate |
| Carrying cost | +0.00 | calculated |
| Delivered over CHI | +10.35 |