Marathon Petroleum Corporation · El Paso, TX
Crude distillation 133,000 bpd operable, 133,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
| Catalytic cracking (FCC) | 33,300 |
| Catalytic reforming — low pressure | 29,500 |
| Vacuum distillation | 55,500 sd |
| Hydrotreating — diesel | 50,500 sd |
| Hydrotreating — kerosene & jet | 9,500 sd |
| Hydrotreating — gasoline | 38,500 sd |
| Hydrotreating — naphtha / reformer feed | 34,000 sd |
Light, sweet crude oil from the Permian and Delaware Basins (West Texas/New Mexico); some sour WTS handled historically per older refinery profiles.
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Kinder Morgan Wink Pipeline System Kinder Morgan CO2 describes the Wink Pipeline System as a 450-mile Texas intrastate crude oil line running from its SACROC unit and McCamey to a terminal in Wink and a refinery in El Paso. It says the system delivers approximately 145,000 barrels of oil per day. The operator's page does not name the refinery. |
Kinder Morgan's SACROC unit in Scurry County, TX and McCamey, TX, through the Wink, TX terminal | crude | source |
| crude in | pipeline | Western Refining Delaware Basin gathering system Western built a Delaware Basin gathering network of a 100,000 bpd pipeline plus a 38,000 bpd truck-unloading facility, together able to supply up to 138,000 bpd of WTI-grade crude, delivering into the Kinder Morgan Wink pipeline system for onward transport to the refinery. |
Delaware Basin (Bone Springs/Avalon plays), West Texas/New Mexico | crude | source |
| products out | pipeline | SFPP East Line Kinder Morgan's Pacific Operations brochure of March 2025 shows Marathon El Paso as an input to El Paso Station, which feeds the El Paso Breakout at the start of the East Line to Tucson and Phoenix, AZ. The SFPP East Line tariff names El Paso as the origin and makes the shipper responsible for delivering product to it. Diamond Junction is a separate input for Texas Panhandle and East Texas suppliers. |
Kinder Morgan El Paso Station, El Paso, TX | gasoline distillate | source |
| products out | pipeline | Magellan Pipeline Magellan Pipeline Company (ONEOK) tariff F.E.R.C. No. 161.67.0, effective July 1, 2026, names the Marathon El Paso Refinery as an origin through El Paso Station. Item 320 covers movements north to Belen Station and Albuquerque Station, NM, and Item 340 covers local movements in El Paso, including to the SFPP interconnect. F.E.R.C. No. 182.16.0 covers El Paso Station to the United States-Mexico border and names the refinery as a source. |
Magellan El Paso Station, El Paso, TX | gasoline distillate | source |
| products out | truck rack | Western El Paso truck rack (IRS T-74-TX-2724) The IRS active fuel terminal list dated 8/30/2026 carries terminal T-74-TX-2724, Western El Paso, at 6501 Trowbridge, El Paso, TX 79905. Gasoline, diesel, jet fuel, propane and asphalt are distributed mainly to the local and regional market. |
6501 Trowbridge, El Paso, TX | gasoline distillate jet fuel asphalt propane | source |
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Kinder Morgan SFPP |
El Paso per research
|
4 | 11 | 88.83 | 160.74 |
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Reporting describes a $130 million turnaround completed/underway at the Marathon El Paso refinery. source
Marathon began shutting down units at the refinery after a failure of the main fractionator reflux pump. source
A third-party power outage triggered a five-hour flaring incident (three stacks) and a facility-wide shutdown; the refinery released 501 lbs of sulfur dioxide at 100% opacity; no injuries; nearby residents reported large smoke/fire plumes and said they were not alerted, prompting a community fact-check by El Paso Matters. source
Marathon conducted a plant-wide maintenance turnaround at the 56,000 bpd El Paso North Refinery unit, expected to wrap up within the week. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.