Premcor Refining Group Inc. (operating subsidiary of Valero Refining Company / Valero Energy) · Valero Energy Corporation · Port Arthur, TX
Crude distillation 385,000 bpd operable, 385,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
| Catalytic cracking (FCC) | 73,050 |
| Hydrocracking — gas oil | 124,350 |
| Delayed coking | 142,440 |
| Catalytic reforming — low pressure | 50,870 |
| Vacuum distillation | 220,000 sd |
| Hydrotreating — diesel | 104,600 sd |
| Hydrotreating — kerosene & jet | 33,000 sd |
| Hydrotreating — gasoline | 90,000 sd |
| Hydrotreating — naphtha / reformer feed | 58,000 sd |
| Hydrotreating — heavy gas oil | 60,000 sd |
Heavy sour crude: Canadian oil sands (WCS), Mexican Maya, and increasingly Venezuelan heavy crude as sanctions have eased, per East Daley Analytics; the 2023 coker project specifically increased Valero's ability to upgrade heavy, high-resid slates.
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | marine | Sabine-Neches Waterway NOAA Coast Pilot 5 (October 2026 edition) lists the refinery's Berths Nos. 0 to 6 for receipt and shipment of crude oil. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 3,338,590 barrels of crude imported from Mexico that month. |
Waterborne crude, including imports from Mexico | crude | source |
| crude in | pipeline | Nederland to Port Arthur crude pipeline RBN Energy states Nederland terminal has direct pipeline connections to the Valero and Total Port Arthur refineries in addition to Motiva and ExxonMobil Beaumont. |
Nederland Terminal (Sunoco/Energy Transfer) | crude | source |
| crude in | pipeline | Keystone Pipeline Keystone/Marketlink barrels reach the Nederland hub; the Port Neches Link spur was purpose-built for Motiva specifically, so a direct Keystone-to-Valero-PA connection is plausible via Nederland terminal blending/redelivery but not separately confirmed by a Valero-specific source. |
South Bow Keystone Nederland Delivery Station | crude | source |
| crude in | pipeline | The Premcor Pipeline Co. crude line The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 7,375,100 barrels of crude received from The Premcor Pipeline Co. (pipeline registration T-1 03-1065). That was about 7.4 of the 10.7 million barrels of crude received that month. The report does not name the line or where it starts. |
crude | source | |
| products out | truck rack | Premcor Refining Group Inc. (Valero) refinery rack, IRS terminal T-76-TX-2854 The IRS terminal list carries T-76-TX-2854 under Premcor Refining Group Inc. at 1801 Gulfway Dr, Port Arthur. The list has no Valero LP record in Port Arthur. The products loaded at the rack are not stated. |
Refinery site, 1801 Gulfway Dr, Port Arthur | source | |
| products out | pipeline | Explorer Pipeline Explorer sketch 000-SK-1079 (revised April 2022) shows the 30-inch Valero gasoline and oil meters A03 and A04 and El Vista feeding Port Arthur Station. Colonial FERC 3.33.0 (effective July 1, 2026) Route 03 prices the movement from the Port Arthur Products Station to Explorer Pipeline. The refinery's Railroad Commission report for May 2024 shows 5.5 million barrels of gasoline and diesel delivered to the Port Arthur Products Station. |
Explorer Port Arthur Station, origin meters A03 (Valero, gasoline) and A04 (Valero, oil) via 30-inch lines from the El Vista tankage; also from the Port Arthur Products Station | gasoline distillate | source |
| products out | pipeline | Colonial Pipeline Colonial FERC 3.33.0 (effective July 1, 2026) Route 01 is a pump over charge for movements from the Port Arthur Products Station into Colonial Pipeline. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 2,849,632 barrels of gasoline and 2,643,640 barrels of diesel delivered to the Port Arthur Products Station. |
Port Arthur Products Station, Port Arthur, Jefferson County, Texas | gasoline distillate | source |
| products out | pipeline | Sunoco Pipeline (Energy Transfer) Sunoco Pipeline L.P. tariff TX No. 80.12 lists the origin Hebert, Jefferson County, Texas (Valero Pipeline), with rates to the Hebert Tank Farm and Center Terminal. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 339,150 barrels of gasoline and 382,685 barrels of diesel delivered to Sunoco Pipeline. |
Hebert, Jefferson County, Texas (Valero Pipeline) | gasoline distillate | source |
| products out | marine | Premcor Refining Group Port Arthur Refinery Berths Nos. 0 to 6 NOAA Coast Pilot 5 (October 2026 edition) lists Berths Nos. 0 to 6 for receipt and shipment of crude oil, petroleum products, petrochemicals and liquid caustic soda, owned by Premcor Refining Group, Inc. It does not break the products down by grade. A separate refinery wharf is listed for shipment of liquid sulphur. |
Refinery wharves, Port Arthur, Sabine-Neches Waterway | source |
The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.
| Berth | Max draft | Max length | Max beam | Air draft |
|---|---|---|---|---|
| Dock 1, 3, 5 | 40 ft | 750 ft | 106 ft | – |
Source: Moran Shipping Agencies port directory, read 2026-10-10.
Source: NOAA Coast Pilot 5, read 2026-10-11.
| Pipeline | Injects at | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|---|
| Explorer Pipeline |
Port Arthur (Jefferson County, TX) per research
|
33 | 41 | 96.30 | 310.00 |
| Enterprise / TEPPCO |
North Port Arthur (Jefferson Co., TX) - interconnect with Enterprise Refined Products storage same city
|
15 | 22 | 204.70 | 351.08 |
| Magellan Midstream |
Port Arthur / Port Neches, TX (via Explorer) same city
|
9 | 8 | 603.88 | 686.75 |
| Colonial Pipeline |
Port Arthur Products Station per research
|
3 | 3 | 20.13 | 26.39 |
| Sunoco / Energy Transfer |
Port Arthur (Motiva Refinery or Enterprise Products Terminal) per research
|
3 | 3 | 28.53 | 192.25 |
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
Power outage following storm Edouard hit the Port Arthur refinery; smaller AVU-147 crude unit was shut and the larger AVU-146 CDU ran at minimum rates. source
Explosion and ~5-hour fire at the diesel hydrotreater (unforeseen process-fluid release) forced a full shutdown of the 380,000-435,000 bpd refinery; no injuries reported. Partial restart underway through April 2026; diesel hydrotreater rebuild timeline unknown as of late April 2026, kerosene hydrotreater targeted for Q3 2026. source
A fire was reported at Valero's Port Arthur plant, referenced later by trade press covering the 2026 explosion. Its scope and duration are not stated. source
Valero completed a coker project at Port Arthur, raising crude throughput capacity to ~435,000 bpd and improving heavy/high-resid crude upgrading capability. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.