#62 of 422 U.S. rack markets by terminals
| Terminal | TCN | Location | Delivered by |
|---|---|---|---|
| Buckeye Pipe Line Holdings, L.P. - Taylor | T-38-MI-3007 | Taylor, MI | Buckeye Pipeline |
| Buckeye Terminals, LLC - Dearborn | T-38-MI-3006 | Taylor, MI | no pipeline tariff on file |
| Buckeye Terminals, LLC - Taylor East | T-38-MI-3014 | Taylor, MI | Buckeye Pipeline |
| Buckeye Terminals, LLC - Woodhaven | T-38-MI-3024 | Woodhaven, MI | Buckeye Pipeline |
| Cousins Petroleum - Taylor | T-38-MI-3012 | Taylor, MI | no pipeline tariff on file |
Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.
| Pipeline system | Terminals here | Delivery points | Refineries confirmed | All reachable |
|---|---|---|---|---|
| Buckeye Pipeline | 3 | 2 | 0 | 4 |
| Refinery | Location | Via | Link |
|---|---|---|---|
| BP Whiting Refinery | Whiting, IN | Wolverine Pipeline | confirmed |
| CITGO Lake Charles Refinery | Lake Charles, LA | Explorer Pipeline | per research |
| CITGO Lemont Refinery | Lemont, IL | Wolverine Pipeline | per research |
| Cenovus Lima Refinery | Lima, OH | Buckeye Pipeline | per research |
| ExxonMobil Baytown Refinery | Baytown, TX | Explorer Pipeline | per research |
| ExxonMobil Beaumont Refinery | Beaumont, TX | Explorer Pipeline | per research |
| ExxonMobil Joliet Refinery | Joliet, IL | Wolverine Pipeline | per research |
| Marathon Petroleum Detroit Refinery | Detroit, MI | Buckeye Pipeline | per research |
| Motiva Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | per research |
| Ohio Refining Company Toledo Refinery (formerly BP-Husky) | Toledo, OH | Buckeye Pipeline, Sunoco / Energy Transfer | per research |
| PBF Toledo Refinery | Toledo, OH | Buckeye Pipeline, Sunoco / Energy Transfer | per research |
| Valero Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | per research |
| Chevron Pasadena Refinery (Pasadena Refining System, Inc.) | Pasadena, TX | Explorer Pipeline, Marathon Pipe Line (MPLX), Phillips 66 Pipeline | inferred (same city) |
| Phillips 66 Sweeny Refinery | Sweeny, TX | Phillips 66 Pipeline | inferred (same city) |
| TotalEnergies Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline, Explorer Pipeline | inferred (same city) |
| Valero Houston Refinery | Houston, TX | Explorer Pipeline | inferred (same city) |
| Wood River Refinery | Wood River, IL | Explorer Pipeline, Phillips 66 Pipeline | inferred (same city) |
| County | State | Share here | People counted here | Gasoline gal/day | Diesel gal/day | County population | Miles |
|---|---|---|---|---|---|---|---|
| Wayne County | MI | 29% | 505,060 | 523,830 | 102,765 | 1,769,038 | 4 |
| Macomb County | MI | 23% | 203,831 | 199,726 | 32,219 | 886,221 | 36 |
| Washtenaw County | MI | 31% | 115,951 | 152,073 | 31,240 | 370,214 | 29 |
| St. Clair County | MI | 25% | 40,699 | 45,656 | 12,682 | 160,486 | 58 |
| Monroe County | MI | 23% | 36,255 | 55,659 | 16,537 | 156,004 | 24 |
| Lenawee County | MI | 18% | 17,121 | 16,972 | 2,968 | 97,779 | 47 |
| Ottawa County | OH | 15% | 6,005 | 8,898 | 3,761 | 39,481 | 49 |
Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.
How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Detroit on Buckeye Pipeline to DEARBORN (FERC No. 446.52.0 item Table 1).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.699 | published | Buckeye Pipeline FERC No. 446.52.0 item Table 1: Detroit → DEARBORN, 71.34 ¢/bbl |
| Carrying cost | 0.300 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 7.581 days (0.081 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 8 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 3.741 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (13 of 13). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 1.70 | 0.30 | 0.24 | 1.50 | 3.74 | 7.6 | — | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.46 | 0.30 | 0.24 | 1.50 | 4.51 | 7.6 | 0.77 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.80 | 0.31 | 0.24 | 1.50 | 4.85 | 7.9 | 1.11 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.81 | 0.32 | 0.24 | 1.50 | 4.87 | 8.0 | 1.13 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.82 | 0.30 | 0.24 | 1.50 | 4.87 | 7.6 | 1.13 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.81 | 0.33 | 0.24 | 1.50 | 4.88 | 8.4 | 1.14 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.84 | 0.34 | 0.24 | 1.50 | 4.92 | 8.5 | 1.18 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.86 | 0.35 | 0.24 | 1.50 | 4.95 | 8.8 | 1.21 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.88 | 0.35 | 0.24 | 1.50 | 4.97 | 8.9 | 1.23 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 3.74 | 0.36 | 0.24 | 1.50 | 5.84 | 9.2 | 2.10 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 3.78 | 0.37 | 0.24 | 1.50 | 5.88 | 9.3 | 2.14 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 6.87 | 0.40 | 0.24 | 1.50 | 9.01 | 10.1 | 5.27 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 6.93 | 0.40 | 0.24 | 1.50 | 9.08 | 10.1 | 5.34 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
Route used: from Detroit on Buckeye Pipeline to DEARBORN (FERC No. 446.52.0 item Table 1).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.699 | published | Buckeye Pipeline FERC No. 446.52.0 item Table 1: Detroit → DEARBORN, 71.34 ¢/bbl |
| Carrying cost | 0.459 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 7.581 days (0.081 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 8 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 4.029 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (13 of 13). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 1.70 | 0.46 | 0.37 | 1.50 | 4.03 | 7.6 | — | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.46 | 0.46 | 0.37 | 1.50 | 4.80 | 7.6 | 0.77 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.80 | 0.48 | 0.37 | 1.50 | 5.15 | 7.9 | 1.12 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.82 | 0.46 | 0.37 | 1.50 | 5.16 | 7.6 | 1.13 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Toledo | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.81 | 0.48 | 0.37 | 1.50 | 5.17 | 8.0 | 1.14 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.81 | 0.51 | 0.37 | 1.50 | 5.19 | 8.4 | 1.16 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.84 | 0.52 | 0.37 | 1.50 | 5.23 | 8.5 | 1.20 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 2.86 | 0.53 | 0.37 | 1.50 | 5.26 | 8.8 | 1.23 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 2.88 | 0.54 | 0.37 | 1.50 | 5.29 | 8.9 | 1.26 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 3.74 | 0.56 | 0.37 | 1.50 | 6.17 | 9.2 | 2.14 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 3.78 | 0.56 | 0.37 | 1.50 | 6.21 | 9.3 | 2.18 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | Woodhaven only point in the city | Buckeye Terminals, LLC - Woodhaven | 6.87 | 0.61 | 0.37 | 1.50 | 9.35 | 10.1 | 5.32 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | DEARBORN | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East | 6.93 | 0.61 | 0.37 | 1.50 | 9.42 | 10.1 | 5.39 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Origin | Pipeline | Delivery point | Product | ¢/bbl | ¢/gal | Refineries at the origin | Tariff |
|---|---|---|---|---|---|---|---|
| Detroit | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 22.63 | 0.54 | Marathon Petroleum Detroit Refinery | FERC No. 446.52.0 item Table 1 note (4) |
| Detroit | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 71.34 | 1.70 | Marathon Petroleum Detroit Refinery | FERC No. 446.52.0 item Table 1 |
| Woodhaven | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 103.44 | 2.46 | FERC No. 446.52.0 item Table 1 | |
| Toledo | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 117.48 | 2.80 | Ohio Refining Company Toledo Refinery (formerly BP-Husky); PBF Toledo Refinery | FERC No. 446.52.0 item Table 1 |
| Findlay | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 117.85 | 2.81 | FERC No. 446.52.0 item Table 1 | |
| Toledo | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 117.98 | 2.81 | Ohio Refining Company Toledo Refinery (formerly BP-Husky); PBF Toledo Refinery | FERC No. 446.52.0 item Table 1 |
| Detroit | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 118.64 | 2.83 | Marathon Petroleum Detroit Refinery | FERC No. 446.52.0 item Table 1 |
| Findlay | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 119.12 | 2.84 | FERC No. 446.52.0 item Table 1 | |
| Lima | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 120.04 | 2.86 | Cenovus Lima Refinery | FERC No. 446.52.0 item Table 1 |
| Lima | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 120.80 | 2.88 | Cenovus Lima Refinery | FERC No. 446.52.0 item Table 1 |
| Huntington | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 156.97 | 3.74 | FERC No. 446.52.0 item Table 1 | |
| Huntington | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 158.57 | 3.78 | FERC No. 446.52.0 item Table 1 | |
| Chicago Complex | Buckeye Pipeline | Woodhaven same city (inferred) | gasoline, distillate | 288.36 | 6.87 | FERC No. 446.52.0 item Table 1 | |
| Chicago Complex | Buckeye Pipeline | DEARBORN per research | gasoline, distillate | 291.17 | 6.93 | FERC No. 446.52.0 item Table 1 |
One pipeline system delivers here: Buckeye Pipeline. An outage on it leaves the market to truck, rail or water.
| Pipeline system | Terminals it reaches here | With no other pipeline | Which |
|---|---|---|---|
| Buckeye Pipeline | 3 | 3 | Buckeye Pipe Line Holdings, L.P. - Taylor; Buckeye Terminals, LLC - Taylor East; Buckeye Terminals, LLC - Woodhaven |
Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.
An estimate for each terminal: the cheapest of published rail rates and trucking from the nearest plants, plus basis, transload, terminaling and carrying cost. Each terminal page shows the build-up line by line.
| Terminal | ¢/gal over Chicago | By | From | Miles |
|---|---|---|---|---|
| Buckeye Terminals, LLC - Taylor East | +4.69 | truck | Marysville Ethanol LLC (Marysville, MI) | 71 |
| Buckeye Pipe Line Holdings, L.P. - Taylor | +4.70 | truck | Marysville Ethanol LLC (Marysville, MI) | 71 |
| Cousins Petroleum - Taylor | +4.76 | truck | Marysville Ethanol LLC (Marysville, MI) | 72 |
| Buckeye Terminals, LLC - Dearborn | +4.80 | truck | Marysville Ethanol LLC (Marysville, MI) | 73 |
| Buckeye Terminals, LLC - Woodhaven | +4.99 | truck | Marysville Ethanol LLC (Marysville, MI) | 77 |
Rack markets within 75 miles (straight line): where a buyer here could also lift.
| Rack market | Miles | Terminals | Pipelines |
|---|---|---|---|
| Romulus, MI | 2 | 2 | 2 |
| Detroit, MI | 6 | 6 | 2 |
| River Rouge, MI | 9 | 3 | — |
| Novi, MI | 19 | 1 | 1 |
| Toledo, OH | 41 | 6 | 1 |
| Jackson, MI | 56 | 3 | 1 |
| Flint, MI | 66 | 2 | 1 |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.