#234 of 422 U.S. rack markets by terminals
| Terminal | TCN | Location | Delivered by |
|---|---|---|---|
| Lucknow-Highspire Terminal - Highspire | T-23-PA-1716 | Middletown, PA | Buckeye Pipeline |
Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.
| Pipeline system | Terminals here | Delivery points | Refineries confirmed | All reachable |
|---|---|---|---|---|
| Buckeye Pipeline | 1 | 1 | 0 | 7 |
| Refinery | Location | Via | Link |
|---|---|---|---|
| Bayway Refinery (Phillips 66) | Linden, NJ | Buckeye Pipeline, Colonial Pipeline, Sunoco / Energy Transfer | per research |
| CITGO Lake Charles Refinery | Lake Charles, LA | Colonial Pipeline | per research |
| Calcasieu Refining Company | Lake Charles, LA | Colonial Pipeline | per research |
| Cenovus Lima Refinery | Lima, OH | Buckeye Pipeline | per research |
| Chevron Pasadena Refinery (Pasadena Refining System, Inc.) | Pasadena, TX | Colonial Pipeline, Marathon Pipe Line (MPLX) | per research |
| ExxonMobil Baton Rouge Refinery | Baton Rouge, LA | Bengal Pipeline, Colonial Pipeline | per research |
| ExxonMobil Baytown Refinery | Baytown, TX | Colonial Pipeline | per research |
| ExxonMobil Beaumont Refinery | Beaumont, TX | Colonial Pipeline | per research |
| Hunt Refining Company - Tuscaloosa Refinery | Tuscaloosa, AL | Colonial Pipeline | per research |
| Krotz Springs Refinery | Krotz Springs, LA | Colonial Pipeline | per research |
| Marathon Galveston Bay Refinery | Galveston Bay, TX | Colonial Pipeline | per research |
| Marathon Garyville Refinery | Garyville, LA | Bengal Pipeline | per research |
| Marathon Petroleum Detroit Refinery | Detroit, MI | Buckeye Pipeline | per research |
| Motiva Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline | per research |
| Ohio Refining Company Toledo Refinery (formerly BP-Husky) | Toledo, OH | Buckeye Pipeline | per research |
| PBF Toledo Refinery | Toledo, OH | Buckeye Pipeline | per research |
| Paulsboro Refinery (Paulsboro Refining Company LLC) | Paulsboro, NJ | Buckeye Pipeline, Colonial Pipeline, Sunoco / Energy Transfer | per research |
| Pemex Deer Park Refinery (Deer Park Refining Limited Partnership) | Deer Park, TX | Colonial Pipeline | per research |
| Phillips 66 Lake Charles Refinery (Lake Charles Manufacturing Complex) | Westlake, LA | Colonial Pipeline | per research |
| Placid Refining Company Port Allen Refinery | Port Allen, LA | Colonial Pipeline | per research |
| Shell Norco Manufacturing Complex (Norco Refinery) | Norco, LA | Bengal Pipeline | per research |
| Trainer Refinery (Monroe Energy LLC) | Trainer, PA | Buckeye Pipeline | per research |
| Valero Houston Refinery | Houston, TX | Colonial Pipeline | per research |
| Valero Meraux Refinery | Meraux, LA | Colonial Pipeline | per research |
| Valero Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline | per research |
| Valero St. Charles Refinery (Norco Refinery) | Norco, LA | Bengal Pipeline | per research |
| Valero Texas City Refinery | Texas City, TX | Colonial Pipeline | per research |
| TotalEnergies Port Arthur Refinery | Port Arthur, TX | Colonial Pipeline | inferred (same city) |
| County | State | Share here | People counted here | Gasoline gal/day | Diesel gal/day | County population | Miles |
|---|---|---|---|---|---|---|---|
| York County | PA | 28% | 131,549 | 112,553 | 40,361 | 473,197 | 21 |
| Dauphin County | PA | 37% | 109,391 | 119,397 | 52,815 | 293,351 | 13 |
| Cumberland County | PA | 22% | 62,053 | 70,458 | 42,125 | 277,270 | 25 |
| Lebanon County | PA | 23% | 34,107 | 32,250 | 18,363 | 146,380 | 20 |
| Franklin County | PA | 20% | 32,018 | 34,302 | 19,419 | 160,652 | 53 |
| Adams County | PA | 26% | 28,017 | 28,455 | 9,910 | 107,594 | 33 |
| Carroll County | MD | 10% | 17,632 | 15,181 | 2,769 | 176,677 | 47 |
| Perry County | PA | 24% | 11,299 | 14,839 | 7,347 | 46,806 | 28 |
| Mifflin County | PA | 13% | 6,190 | 6,507 | 2,838 | 46,127 | 52 |
| Snyder County | PA | 12% | 4,830 | 6,177 | 2,679 | 39,655 | 40 |
| Juniata County | PA | 19% | 4,484 | 7,208 | 3,862 | 23,403 | 39 |
Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.
How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Chelsea Jct. on Buckeye Pipeline to HIGHSPIRE (FERC No. 442.42.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.234 | published | Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → HIGHSPIRE (b), 51.82 ¢/bbl |
| Carrying cost | 0.333 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 8.419 days (0.919 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 88 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 3.310 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (5 of 5). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Chelsea Jct. | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 1.23 | 0.33 | 0.24 | 1.50 | 3.31 | 8.4 | — | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Booth | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 2.64 | 0.33 | 0.24 | 1.50 | 4.72 | 8.4 | 1.41 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Eagle Point | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 3.00 | 0.34 | 0.24 | 1.50 | 5.08 | 8.6 | 1.77 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Linden | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 4.27 | 0.36 | 0.24 | 1.50 | 6.37 | 9.1 | 3.06 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Point Breeze | Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 6.51 | 0.45 | 0.49 | 1.50 | 8.95 | 11.4 | 5.64 | FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing |
Route used: from Chelsea Jct. on Buckeye Pipeline to HIGHSPIRE (FERC No. 442.42.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.234 | published | Buckeye Pipeline FERC No. 442.42.0: Chelsea Jct. → HIGHSPIRE (b), 51.82 ¢/bbl |
| Carrying cost | 0.510 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 8.419 days (0.919 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 88 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 3.616 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (5 of 5). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Chelsea Jct. | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 1.23 | 0.51 | 0.37 | 1.50 | 3.62 | 8.4 | — | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Booth | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 2.64 | 0.51 | 0.37 | 1.50 | 5.02 | 8.4 | 1.41 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Eagle Point | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 3.00 | 0.52 | 0.37 | 1.50 | 5.39 | 8.6 | 1.77 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Linden | Buckeye Pipeline | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 4.27 | 0.55 | 0.37 | 1.50 | 6.69 | 9.1 | 3.08 | FERC No. 442.42.0 effective 2025: check for a newer filing |
| Point Breeze | Sunoco / Energy Transfer, then at Macungie: Buckeye Pipeline two pipelines | HIGHSPIRE (b) | Lucknow-Highspire Terminal - Highspire | 6.51 | 0.69 | 0.74 | 1.50 | 9.44 | 11.4 | 5.83 | FERC No. 175.36.0 + FERC No. 442.42.0 effective 2025: check for a newer filing |
| Origin | Pipeline | Delivery point | Product | ¢/bbl | ¢/gal | Refineries at the origin | Tariff |
|---|---|---|---|---|---|---|---|
| Chelsea Jct. | Buckeye Pipeline | HIGHSPIRE (b) | gasoline, distillate | 51.82 | 1.23 | Trainer Refinery (Monroe Energy LLC) | FERC No. 442.42.0 |
| Booth | Buckeye Pipeline | HIGHSPIRE (b) | gasoline, distillate | 110.99 | 2.64 | FERC No. 442.42.0 | |
| Eagle Point | Buckeye Pipeline | HIGHSPIRE (b) | gasoline, distillate | 125.89 | 3.00 | FERC No. 442.42.0 | |
| Macungie | Buckeye Pipeline | HIGHSPIRE (b) | gasoline, distillate | 137.67 | 3.28 | FERC No. 442.42.0 | |
| Linden | Buckeye Pipeline | HIGHSPIRE (b) | gasoline, distillate | 179.20 | 4.27 | Bayway Refinery (Phillips 66) | FERC No. 442.42.0 |
One pipeline system delivers here: Buckeye Pipeline. An outage on it leaves the market to truck, rail or water.
| Pipeline system | Terminals it reaches here | With no other pipeline | Which |
|---|---|---|---|
| Buckeye Pipeline | 1 | 1 | Lucknow-Highspire Terminal - Highspire |
Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.
An estimate for each terminal: the cheapest of published rail rates and trucking from the nearest plants, plus basis, transload, terminaling and carrying cost. Each terminal page shows the build-up line by line.
| Terminal | ¢/gal over Chicago | By | From | Miles |
|---|---|---|---|---|
| Lucknow-Highspire Terminal - Highspire | +17.47 | truck | Western New York Energy LLC (Medina, NY) | 266 |
Rack markets within 75 miles (straight line): where a buyer here could also lift.
| Rack market | Miles | Terminals | Pipelines |
|---|---|---|---|
| Harrisburg, PA | 8 | 3 | 1 |
| Lancaster, PA | 27 | 2 | 2 |
| Sinking Springs, PA | 41 | 2 | 2 |
| Reading, PA | 51 | 2 | 2 |
| Northumberland, PA | 53 | 2 | 1 |
| Baltimore, MD | 69 | 9 | 1 |
| Williamsport, PA | 71 | 3 | 1 |
| Wilmington, DE | 72 | 4 | 1 |
| Macungie, PA | 72 | 6 | 2 |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.