#234 of 422 U.S. rack markets by terminals
| Terminal | TCN | Location | Delivered by |
|---|---|---|---|
| Energy Transfer Marketing & Terminals L.P. | T-75-TX-2678 | Center, TX | Sunoco / Energy Transfer |
Each system with a tariff delivery point at one of this market’s terminals, and how many running refineries can ship on it to here.
| Pipeline system | Terminals here | Delivery points | Refineries confirmed | All reachable |
|---|---|---|---|---|
| Sunoco / Energy Transfer | 1 | 1 | 2 | 4 |
| Refinery | Location | Via | Link |
|---|---|---|---|
| ExxonMobil Beaumont Refinery | Beaumont, TX | Sunoco / Energy Transfer | confirmed |
| Motiva Port Arthur Refinery | Port Arthur, TX | Sunoco / Energy Transfer | confirmed |
| Valero Port Arthur Refinery | Port Arthur, TX | Sunoco / Energy Transfer | per research |
| TotalEnergies Port Arthur Refinery | Port Arthur, TX | Sunoco / Energy Transfer | inferred (same city) |
| County | State | Share here | People counted here | Gasoline gal/day | Diesel gal/day | County population | Miles |
|---|---|---|---|---|---|---|---|
| Angelina County | TX | 100% | 88,154 | 118,268 | 72,209 | 88,154 | 47 |
| Nacogdoches County | TX | 100% | 66,035 | 95,681 | 57,652 | 66,035 | 31 |
| Shelby County | TX | 100% | 24,286 | 43,009 | 25,393 | 24,286 | 0 |
| Sabine Parish | LA | 100% | 21,834 | 27,236 | 6,621 | 21,834 | 38 |
| Rusk County | TX | 24% | 13,099 | 18,864 | 8,542 | 54,854 | 42 |
| Cherokee County | TX | 22% | 11,793 | 16,453 | 7,417 | 53,337 | 59 |
| Sabine County | TX | 100% | 10,012 | 15,464 | 9,510 | 10,012 | 36 |
| De Soto Parish | LA | 36% | 9,986 | 26,351 | 10,617 | 27,381 | 30 |
| Panola County | TX | 37% | 8,613 | 22,005 | 9,845 | 23,018 | 27 |
| San Augustine County | TX | 100% | 7,722 | 15,619 | 9,229 | 7,722 | 29 |
| Natchitoches Parish | LA | 17% | 6,027 | 11,998 | 4,693 | 36,089 | 63 |
| Polk County | TX | 9% | 4,697 | 8,449 | 5,414 | 53,434 | 81 |
| Houston County | TX | 18% | 4,126 | 6,895 | 4,209 | 22,316 | 82 |
| Trinity County | TX | 15% | 2,158 | 3,307 | 1,991 | 14,384 | 77 |
| Tyler County | TX | 10% | 2,001 | 3,248 | 1,430 | 20,443 | 72 |
| Red River Parish | LA | 14% | 1,008 | 2,217 | 558 | 7,165 | 51 |
Fuel demand is an estimate: each state’s taxed gallons for the year (FHWA) are split among its counties by where the driving happens (EPA county vehicle miles, weighted by how much fuel each vehicle type burns), then shared to markets as above. Every state adds back to its FHWA total. Gasoline includes the ethanol blended into it; diesel is FHWA’s special fuels. Expect diesel to be least reliable along long-haul corridors, where trucks buy fuel in one county and burn it in another. Population: U.S. Census Bureau county estimates.
How good is it? Checked in October 2026 against the county retail sales Iowa and California publish: for gasoline, about 3–5% of gallons landed in the wrong rack market and a typical market was within 5–6%. For diesel, 14–21% landed in the wrong market and a typical market was 30–45% off, with truck-stop corridors such as Bakersfield and Stockton under-counted. Treat gasoline as a working estimate and diesel as a rough guide.
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Sunoco Pipeline L.P. Hebert Tank Farm on Sunoco / Energy Transfer to Energy Transfer M&T Center Terminal, Shelby County (TX No. 80.12).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 3.441 | published | Sunoco / Energy Transfer TX No. 80.12: Sunoco Pipeline L.P. Hebert Tank Farm → Energy Transfer M&T Center Terminal, Shelby County, 144.51 ¢/bbl |
| Carrying cost | 0.355 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 8.987 days (1.487 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 143 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 5.539 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (4 of 4). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Sunoco Pipeline L.P. Hebert Tank Farm | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 3.44 | 0.36 | 0.24 | 1.50 | 5.54 | 9.0 | — | TX No. 80.12 |
| Beaumont (ExxonMobil Refinery) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.36 | 0.24 | 1.50 | 6.22 | 9.0 | 0.68 | TX No. 80.12 |
| Hebert (Valero Pipeline) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.36 | 0.24 | 1.50 | 6.22 | 9.0 | 0.68 | TX No. 80.12 |
| Port Arthur (Motiva Refinery or Enterprise Products Terminal) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.36 | 0.24 | 1.50 | 6.22 | 9.1 | 0.68 | TX No. 80.12 |
Route used: from Sunoco Pipeline L.P. Hebert Tank Farm on Sunoco / Energy Transfer to Energy Transfer M&T Center Terminal, Shelby County (TX No. 80.12).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 3.441 | published | Sunoco / Energy Transfer TX No. 80.12: Sunoco Pipeline L.P. Hebert Tank Farm → Energy Transfer M&T Center Terminal, Shelby County, 144.51 ¢/bbl |
| Carrying cost | 0.544 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 8.987 days (1.487 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 143 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 5.857 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (4 of 4). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Terminals | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Sunoco Pipeline L.P. Hebert Tank Farm | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 3.44 | 0.54 | 0.37 | 1.50 | 5.86 | 9.0 | — | TX No. 80.12 |
| Beaumont (ExxonMobil Refinery) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.54 | 0.37 | 1.50 | 6.54 | 9.0 | 0.68 | TX No. 80.12 |
| Hebert (Valero Pipeline) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.54 | 0.37 | 1.50 | 6.54 | 9.0 | 0.68 | TX No. 80.12 |
| Port Arthur (Motiva Refinery or Enterprise Products Terminal) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | Energy Transfer Marketing & Terminals L.P. | 4.12 | 0.55 | 0.37 | 1.50 | 6.54 | 9.1 | 0.68 | TX No. 80.12 |
| Origin | Pipeline | Delivery point | Product | ¢/bbl | ¢/gal | Refineries at the origin | Tariff |
|---|---|---|---|---|---|---|---|
| Sunoco Pipeline L.P. Hebert Tank Farm | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 144.51 | 3.44 | ExxonMobil Beaumont Refinery | TX No. 80.12 |
| Beaumont (ExxonMobil Refinery) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 173.02 | 4.12 | ExxonMobil Beaumont Refinery | TX No. 80.12 |
| Port Arthur (Motiva Refinery or Enterprise Products Terminal) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 173.02 | 4.12 | Motiva Port Arthur Refinery; Valero Port Arthur Refinery; TotalEnergies Port Arthur Refinery | TX No. 80.12 |
| Hebert (Valero Pipeline) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 173.02 | 4.12 | TX No. 80.12 | |
| Beaumont (ExxonMobil Refinery) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 227.77 | 5.42 | ExxonMobil Beaumont Refinery | TX No. 80.12 |
| Port Arthur (Motiva Refinery or Enterprise Products Terminal) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 227.77 | 5.42 | Motiva Port Arthur Refinery; Valero Port Arthur Refinery; TotalEnergies Port Arthur Refinery | TX No. 80.12 |
| Hebert (Valero Pipeline) | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 227.77 | 5.42 | TX No. 80.12 | |
| Sunoco Pipeline L.P. Hebert Tank Farm | Sunoco / Energy Transfer | Energy Transfer M&T Center Terminal, Shelby County | gasoline, distillate | 227.77 | 5.42 | ExxonMobil Beaumont Refinery | TX No. 80.12 |
One pipeline system delivers here: Sunoco / Energy Transfer. An outage on it leaves the market to truck, rail or water.
| Pipeline system | Terminals it reaches here | With no other pipeline | Which |
|---|---|---|---|
| Sunoco / Energy Transfer | 1 | 1 | Energy Transfer Marketing & Terminals L.P. |
Counts pipeline systems with a tariff delivery point here, not capacity, storage or contracts. A system with two lines into the market still counts once, and a terminal with one pipeline may also receive by truck, rail or water. For a refinery or pipeline outage across every market it touches, open that facility’s page.
Rack markets within 75 miles (straight line): where a buyer here could also lift.
| Rack market | Miles | Terminals | Pipelines |
|---|---|---|---|
| Waskom, TX | 53 | 1 | 1 |
| Shreveport, LA | 59 | 3 | 1 |
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.