902 Main Avenue East, West Fargo, ND 58078
As published by ONEOK (Magellan), effective 2025-02-25. Check with the terminal for current availability.
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Magellan Midstream | Fargo (West Fargo), ND | gasoline distillate | confirmed | FERC No. 160.59.0 |
| Cenex Pipeline | Prosper Jct., Cass County, ND | same city |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Minot, Ward County, ND ND | Cenex Pipeline | junction or tank farm | 210.19 | F.E.R.C. No. 16.11.0 |
| Minneapolis (Pine Bend/St Paul Park/Roseville/Rosemount) MN | Magellan Midstream | Flint Hills Resources LP | 384.74 | FERC No. 160.59.0 |
| Fargo Jct., ND (Cenex Pipeline Jct.) ND | Magellan Midstream joint | junction or tank farm | 388.48 | FERC No. 194.8.0 |
| Superior, WI WI | Magellan Midstream | Superior Refining Company LLC | 498.11 | FERC No. 160.59.0 |
| Kansas (Coffeyville/El Dorado/Kansas City Jct.) KS | Magellan Midstream | Hf Sinclair El Dorado Refining LLC | 745.53 | FERC No. 160.59.0 |
| Oklahoma Central (Ponca City) OK | Magellan Midstream | Phillips 66 Company | 745.53 | FERC No. 160.59.0 |
| McPherson, KS KS | Magellan Midstream | Chs Mcpherson Refinery INC | 770.84 | FERC No. 160.59.0 |
| Wichita - Kansas City Interconnect (Phillips 66 Carrier) KS | Magellan Midstream joint | junction or tank farm | 822.84 | FERC No. 160.59.0 |
| Wynnewood, OK OK | Magellan Midstream | Wynnewood Refining CO | 850.99 | FERC No. 160.59.0 |
| Wynnewood, OK / Ardmore, OK (Valero Partners Wynnewood) OK | Magellan Midstream joint |
Valero Refining CO Oklahoma Wynnewood Refining CO |
880.93 | FERC No. 197.9.0 |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Minot, Ward County, ND on Cenex Pipeline to Prosper Jct., Cass County, ND (F.E.R.C. No. 16.11.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 5.005 | published | Cenex Pipeline F.E.R.C. No. 16.11.0: Minot, Ward County, ND → Prosper Jct., Cass County, ND, 210.19 ¢/bbl |
| Carrying cost | 0.397 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 10.028 days (2.528 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 243 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 7.144 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (10 of 10). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Minot, Ward County, ND | Cenex Pipeline | Prosper Jct., Cass County, ND | 5.00 | 0.40 | 0.24 | 1.50 | 7.14 | 10.0 | — | F.E.R.C. No. 16.11.0 |
| Minneapolis (Pine Bend/St Paul Park/Roseville/Rosemount) | Magellan Midstream | Fargo (West Fargo), ND | 9.16 | 0.41 | 0.12* | 1.50 | 11.19 | 10.3 | 4.05 | FERC No. 160.59.0 item 205 |
| Fargo Jct., ND (Cenex Pipeline Jct.) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 9.25 | 0.40 | 0.12* | 1.50 | 11.27 | 10.1 | 4.13 | FERC No. 194.8.0 item 100 |
| Superior, WI | Magellan Midstream | Fargo (West Fargo), ND | 11.86 | 0.40 | 0.12* | 1.50 | 13.89 | 10.2 | 6.74 | FERC No. 160.59.0 item 206 |
| Kansas (Coffeyville/El Dorado/Kansas City Jct.) | Magellan Midstream | Fargo (West Fargo), ND | 17.75 | 0.59 | 0.12* | 1.50 | 19.97 | 15.0 | 12.82 | FERC No. 160.59.0 item 201 |
| Oklahoma Central (Ponca City) | Magellan Midstream | Fargo (West Fargo), ND | 17.75 | 0.63 | 0.12* | 1.50 | 20.00 | 15.9 | 12.86 | FERC No. 160.59.0 item 200 |
| McPherson, KS | Magellan Midstream | Fargo (West Fargo), ND | 18.35 | 0.58 | 0.12* | 1.50 | 20.55 | 14.6 | 13.41 | FERC No. 160.59.0 item 255 |
| Wichita - Kansas City Interconnect (Phillips 66 Carrier) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 19.59 | 0.60 | 0.73* | 1.50 | 22.42 | 15.1 | 15.27 | FERC No. 160.59.0 item 240 |
| Wynnewood, OK | Magellan Midstream | Fargo (West Fargo), ND | 20.26 | 0.70 | 0.12* | 1.50 | 22.58 | 17.6 | 15.44 | FERC No. 160.59.0 item 204 |
| Wynnewood, OK / Ardmore, OK (Valero Partners Wynnewood) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 20.97 | 0.70 | 0.24* | 1.50 | 23.41 | 17.6 | 16.27 | FERC No. 197.9.0 item 200 |
Route used: from Minot, Ward County, ND on Cenex Pipeline to Prosper Jct., Cass County, ND (F.E.R.C. No. 16.11.0).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 5.005 | published | Cenex Pipeline F.E.R.C. No. 16.11.0: Minot, Ward County, ND → Prosper Jct., Cass County, ND, 210.19 ¢/bbl |
| Carrying cost | 0.607 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 10.028 days (2.528 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 243 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 7.484 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (10 of 10). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Minot, Ward County, ND | Cenex Pipeline | Prosper Jct., Cass County, ND | 5.00 | 0.61 | 0.37 | 1.50 | 7.48 | 10.0 | — | F.E.R.C. No. 16.11.0 |
| Minneapolis (Pine Bend/St Paul Park/Roseville/Rosemount) | Magellan Midstream | Fargo (West Fargo), ND | 9.16 | 0.62 | 0.19* | 1.50 | 11.47 | 10.3 | 3.99 | FERC No. 160.59.0 item 205 |
| Fargo Jct., ND (Cenex Pipeline Jct.) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 9.25 | 0.61 | 0.19* | 1.50 | 11.55 | 10.1 | 4.07 | FERC No. 194.8.0 item 100 |
| Superior, WI | Magellan Midstream | Fargo (West Fargo), ND | 11.86 | 0.62 | 0.19* | 1.50 | 14.17 | 10.2 | 6.68 | FERC No. 160.59.0 item 206 |
| Kansas (Coffeyville/El Dorado/Kansas City Jct.) | Magellan Midstream | Fargo (West Fargo), ND | 17.75 | 0.91 | 0.19* | 1.50 | 20.34 | 15.0 | 12.86 | FERC No. 160.59.0 item 201 |
| Oklahoma Central (Ponca City) | Magellan Midstream | Fargo (West Fargo), ND | 17.75 | 0.97 | 0.19* | 1.50 | 20.40 | 15.9 | 12.92 | FERC No. 160.59.0 item 200 |
| McPherson, KS | Magellan Midstream | Fargo (West Fargo), ND | 18.35 | 0.88 | 0.19* | 1.50 | 20.92 | 14.6 | 13.44 | FERC No. 160.59.0 item 255 |
| Wynnewood, OK | Magellan Midstream | Fargo (West Fargo), ND | 20.26 | 1.07 | 0.19* | 1.50 | 23.02 | 17.6 | 15.53 | FERC No. 160.59.0 item 204 |
| Wichita - Kansas City Interconnect (Phillips 66 Carrier) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 19.59 | 0.91 | 1.12* | 1.50 | 23.12 | 15.1 | 15.64 | FERC No. 160.59.0 item 240 |
| Wynnewood, OK / Ardmore, OK (Valero Partners Wynnewood) | Magellan Midstream joint rate | Fargo (West Fargo), ND | 20.97 | 1.07 | 0.37* | 1.50 | 23.91 | 17.6 | 16.43 | FERC No. 197.9.0 item 200 |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-24 | Diesel | Minot, Ward County, ND · Cenex Pipeline | 7.47 | carrying cost −0.06¢; pipeline loss −0.04¢ |
| 2026-11-24 | Gasoline | Minot, Ward County, ND · Cenex Pipeline | 7.13 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-17 | Diesel | Minot, Ward County, ND · Cenex Pipeline | 7.57 | carrying cost −0.04¢; pipeline loss −0.02¢ |
| 2026-11-17 | Gasoline | Minot, Ward County, ND · Cenex Pipeline | 7.17 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Minot, Ward County, ND · Cenex Pipeline | 7.63 | first snapshot |
| 2026-11-16 | Gasoline | Minot, Ward County, ND · Cenex Pipeline | 7.19 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| NuStar Pipeline Operating Partnership L.P.- Moorhead, MN T-41-MN-3400 | Moorhead, MN | 6.5 | gasoline distillate |
| Magellan Pipeline Company, L.P. T-45-ND-3500 | Grand Forks, ND | 73.7 | gasoline distillate |
| NuStar Pipeline Operating Partnership L.P. - Jamestown, ND T-45-ND-3503 | Jamestown, ND | 86.5 | gasoline distillate |
| NuStar Pipeline Operating Partnership L.P. - Jamestown, ND T-45-ND-3502 | Jamestown, ND | 95.5 | gasoline distillate |
| Magellan Pipeline Company, L.P. T-41-MN-3412 | Alexandria, MN | 98.3 | gasoline distillate jet fuel |
By truck direct from Tharaldson Ethanol (Casselton, ND), about 22 road miles.
Assumptions: TOE (Round 2 adders, realistic transit)
| Cost line | ¢/gal | How |
|---|---|---|
| Basis | -12.50 | assumed · Origin-state discount to Chicago |
| Truck freight | +1.25 | estimated · 22 road mi × $4/loaded mi ÷ 8,000 gal |
| Wholesale margin | +0.00 | flat |
| Terminal charge | +1.15 | flat · Terminaling estimate |
| Carrying cost | +0.00 | calculated |
| Delivered over CHI | -10.10 |