15138 Highway 96, Mount Vernon, MO 65712
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Phillips 66 Pipeline | Mount Vernon, Lawrence County, MO | gasoline distillate propane butane | same city | FERC No. 20.14.0 |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Ponca City (Phillips 66 Ponca City refinery) OK | Phillips 66 Pipeline | Phillips 66 Company | 313.97 | FERC No. 20.14.0 |
| Tulsa, OK OK | Phillips 66 Pipeline | junction or tank farm | 313.97 | FERC No. 20.14.0 |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Tulsa, OK on Phillips 66 Pipeline to Mount Vernon, Lawrence County, MO (FERC No. 20.14.0 item Clean Products rate table).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 7.476 | published | Phillips 66 Pipeline FERC No. 20.14.0 item Clean Products rate table: Tulsa, OK → Mount Vernon, Lawrence County, MO, 313.97 ¢/bbl |
| Carrying cost | 0.376 | calculated | $2.510000/gal × 5.9200% ÷ 365 × 9.229 days (1.729 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 166 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.251 | published | Phillips 66 Pipeline FERC No. 20.14.0 item 6, tender deduction: 0.10% of volume at $2.5100/gal = 10.54 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 9.602 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (2 of 2). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Tulsa, OK | Phillips 66 Pipeline | Mount Vernon, Lawrence County, MO | 7.48 | 0.38 | 0.25* | 1.50 | 9.60 | 9.2 | — | FERC No. 20.14.0 item Clean Products rate table |
| Ponca City (Phillips 66 Ponca City refinery) | Phillips 66 Pipeline | Mount Vernon, Lawrence County, MO | 7.48 | 0.40 | 0.25* | 1.50 | 9.62 | 9.7 | 0.02 | FERC No. 20.14.0 item Clean Products rate table |
Route used: from Tulsa, OK on Phillips 66 Pipeline to Mount Vernon, Lawrence County, MO (FERC No. 20.14.0 item Clean Products rate table).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 7.476 | published | Phillips 66 Pipeline FERC No. 20.14.0 item Clean Products rate table: Tulsa, OK → Mount Vernon, Lawrence County, MO, 313.97 ¢/bbl |
| Carrying cost | 0.588 | calculated | $3.930000/gal × 5.9200% ÷ 365 × 9.229 days (1.729 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 166 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.393 | published | Phillips 66 Pipeline FERC No. 20.14.0 item 6, tender deduction: 0.10% of volume at $3.9300/gal = 16.51 ¢/bbl |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 9.957 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (2 of 2). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Tulsa, OK | Phillips 66 Pipeline | Mount Vernon, Lawrence County, MO | 7.48 | 0.59 | 0.39* | 1.50 | 9.96 | 9.2 | — | FERC No. 20.14.0 item Clean Products rate table |
| Ponca City (Phillips 66 Ponca City refinery) | Phillips 66 Pipeline | Mount Vernon, Lawrence County, MO | 7.48 | 0.62 | 0.39* | 1.50 | 9.99 | 9.7 | 0.03 | FERC No. 20.14.0 item Clean Products rate table |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-17 | Diesel | Tulsa, OK · Phillips 66 Pipeline | 9.98 | carrying cost −0.04¢; pipeline loss −0.02¢ |
| 2026-11-17 | Gasoline | Tulsa, OK · Phillips 66 Pipeline | 9.60 | carrying cost −0.02¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Tulsa, OK · Phillips 66 Pipeline | 10.04 | first snapshot |
| 2026-11-16 | Gasoline | Tulsa, OK · Phillips 66 Pipeline | 9.63 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| Magellan Pipeline Company, L.P. T-43-MO-3727 | Mount Vernon, MO | 0.3 | gasoline distillate |
| Magellan Pipeline Company, L.P. T-43-MO-3718 | Brookline, MO | 19.9 | unknown |
| Magellan Pipeline Company, L.P. T-43-MO-3707 | Jasper, MO | 30.0 | gasoline distillate |
| Magellan Pipeline Company, L.P. T-71-AR-2467 | Rogers, AR | 61.2 | gasoline distillate |
By truck direct from East Kansas Agri-Energy LLC (Garnett, KS), about 131 road miles.
Assumptions: TOE (Round 2 adders, realistic transit)
| Cost line | ¢/gal | How |
|---|---|---|
| Basis | -12.50 | table · Origin-state discount to Chicago |
| Truck freight | +6.55 | estimated · 131 road mi × $4/loaded mi ÷ 8,000 gal |
| Wholesale margin | +0.00 | flat |
| Terminal charge | +1.15 | flat · Terminaling estimate |
| Carrying cost | +0.00 | calculated |
| Delivered over CHI | -4.80 |