3651 Fisher Road, Columbus, OH 43228
Tariff delivery points this terminal sits on.
| Pipeline | Delivery point | Products | Match | Source |
|---|---|---|---|---|
| Buckeye Pipeline | COLUMBUS | gasoline distillate | confirmed | FERC No. 446.52.0 |
| Inland Corporation | Columbus | gasoline distillate | same city | FERC No. 31.38.0; Ohio Rate Sheet No. 6.21.1 |
| Marathon Pipe Line (MPLX) | Columbus, OH (Franklin County) | gasoline distillate | same city | FERC No. 76.35.0 (ORPL) |
| Marathon Pipe Line (MPLX) | Columbus, OH (Kenova-Columbus terminus) | gasoline distillate jet fuel | same city | |
| Marathon Pipe Line (MPLX) | Columbus, OH | same city |
| Origin | Pipeline or mode | Refineries at origin | ¢/bbl | Source |
|---|---|---|---|---|
| Lima OH | Inland Corporation incentive | Lima Refining Company | 9.66 | FERC No. 31.38.0 |
| Lima OH | Inland Corporation incentive | Lima Refining Company | 9.66 | Ohio Rate Sheet No. 6.21.1 |
| Toledo (incl. Cedar Point) OH | Inland Corporation incentive |
Bp-Husky Refining LLC Toledo Refining CO LLC |
14.70 | Ohio Rate Sheet No. 6.21.1 |
| Toledo (incl. Cedar Point) OH | Inland Corporation incentive |
Bp-Husky Refining LLC Toledo Refining CO LLC |
14.70 | FERC No. 31.38.0 |
| Heath, OH OH | Marathon Pipe Line (MPLX) volume_incentive | junction or tank farm | 41.14 | F.E.R.C. No. 76.35.0 |
| Columbus, OH OH | Marathon Pipe Line (MPLX) | junction or tank farm | 60.94 | F.E.R.C. No. 76.35.0 |
| Lima OH | Inland Corporation volume_tier | Lima Refining Company | 76.89 | Ohio Rate Sheet No. 6.21.1 |
| Lima OH | Inland Corporation volume_tier | Lima Refining Company | 82.89 | Ohio Rate Sheet No. 6.21.1 |
| Lima OH | Buckeye Pipeline volume_tier | Lima Refining Company | 85.19 | FERC No. 446.52.0 |
| Lima OH | Buckeye Pipeline | Lima Refining Company | 97.59 | FERC No. 446.52.0 |
| Lima OH | Inland Corporation | Lima Refining Company | 97.70 | FERC No. 31.38.0 |
| Lima OH | Inland Corporation volume_tier | Lima Refining Company | 98.89 | Ohio Rate Sheet No. 6.21.1 |
| Heath, OH OH | Marathon Pipe Line (MPLX) | junction or tank farm | 110.31 | F.E.R.C. No. 76.35.0 |
| Fostoria OH | Inland Corporation | junction or tank farm | 153.79 | FERC No. 31.38.0 |
| Toledo (incl. Cedar Point) OH | Inland Corporation |
Bp-Husky Refining LLC Toledo Refining CO LLC |
156.02 | FERC No. 31.38.0 |
| Toledo (incl. Cedar Point) OH | Inland Corporation |
Bp-Husky Refining LLC Toledo Refining CO LLC |
158.12 | Ohio Rate Sheet No. 6.21.1 |
| Fostoria OH | Inland Corporation | junction or tank farm | 159.43 | Ohio Rate Sheet No. 6.21.1 |
| Toledo OH | Buckeye Pipeline |
Bp-Husky Refining LLC Toledo Refining CO LLC |
165.26 | FERC No. 446.52.0 |
| Huntington IN | Buckeye Pipeline | junction or tank farm | 190.25 | FERC No. 446.52.0 |
| Findlay OH | Buckeye Pipeline | junction or tank farm | 194.80 | FERC No. 446.52.0 |
| Detroit MI | Buckeye Pipeline | Marathon Petroleum CO LP | 262.82 | FERC No. 446.52.0 |
| Woodhaven MI | Buckeye Pipeline | junction or tank farm | 274.71 | FERC No. 446.52.0 |
| Chicago Complex IN | Buckeye Pipeline | junction or tank farm | 334.74 | FERC No. 446.52.0 |
| Kenova, WV (Catlettsburg refinery via MPC Kenova Terminal) WV | Marathon Pipe Line (MPLX) private | Marathon Petroleum CO LP | Private line | Private line: Kenova-Columbus (ORPL) |
What it costs to move a gallon here from a supply origin at filed tariff rates: line-haul, the cost of financing the product on the way and in the tank, pipeline loss, and terminaling. It is a cost at filed rates, not a market price: add it to the origin spot price for a delivered cost. The figure shown is the lowest route that starts where product enters the pipeline system; where a second pipeline is needed to reach here, both are costed. Lines marked "estimate" are placeholders until the pipeline or terminal figure is on file; in the routes table, * marks a figure taken from the tariff.
Route used: from Columbus, OH on Marathon Pipe Line (MPLX) to Columbus, OH (F.E.R.C. No. 76.35.0 item Item No. 1).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.451 | published | Marathon Pipe Line (MPLX) F.E.R.C. No. 76.35.0 item Item No. 1: Columbus, OH → Columbus, OH, 60.94 ¢/bbl |
| Carrying cost | 0.297 | calculated | $2.430000/gal × 5.9400% ÷ 365 × 7.500 days (0.000 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 0 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.243 | estimate | flat estimate $0.0024/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 3.491 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Columbus, OH | Marathon Pipe Line (MPLX) | Columbus, OH only point in the city | 1.45 | 0.30 | 0.24 | 1.50 | 3.49 | 7.5 | — | F.E.R.C. No. 76.35.0 item Item No. 1 |
| Lima | Buckeye Pipeline | COLUMBUS | 2.32 | 0.33 | 0.24 | 1.50 | 4.40 | 8.4 | 0.91 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Inland Corporation | Columbus only point in the city | 2.33 | 0.33 | 0.24 | 1.50 | 4.40 | 8.4 | 0.91 | FERC No. 31.38.0 item 1 |
| Heath, OH | Marathon Pipe Line (MPLX) | Columbus, OH only point in the city | 2.63 | 0.31 | 0.24 | 1.50 | 4.68 | 7.9 | 1.19 | F.E.R.C. No. 76.35.0 item Item No. 1 |
| Fostoria | Inland Corporation | Columbus only point in the city | 3.66 | 0.34 | 0.24 | 1.50 | 5.74 | 8.5 | 2.25 | FERC No. 31.38.0 item 1 |
| Toledo (incl. Cedar Point) | Inland Corporation | Columbus only point in the city | 3.71 | 0.35 | 0.24 | 1.50 | 5.81 | 8.9 | 2.32 | FERC No. 31.38.0 item 1 |
| Toledo | Buckeye Pipeline | COLUMBUS | 3.93 | 0.35 | 0.24 | 1.50 | 6.03 | 8.9 | 2.54 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | COLUMBUS | 4.53 | 0.36 | 0.24 | 1.50 | 6.64 | 9.2 | 3.14 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | COLUMBUS | 4.64 | 0.33 | 0.24 | 1.50 | 6.72 | 8.5 | 3.22 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | COLUMBUS | 6.26 | 0.37 | 0.24 | 1.50 | 8.37 | 9.4 | 4.88 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | COLUMBUS | 6.54 | 0.37 | 0.24 | 1.50 | 8.65 | 9.3 | 5.16 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | COLUMBUS | 7.97 | 0.42 | 0.24 | 1.50 | 10.13 | 10.6 | 6.64 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
Route used: from Columbus, OH on Marathon Pipe Line (MPLX) to Columbus, OH (F.E.R.C. No. 76.35.0 item Item No. 1).
| Line | ¢/gal | Basis | Source or working |
|---|---|---|---|
| Line-haul tariff | 1.451 | published | Marathon Pipe Line (MPLX) F.E.R.C. No. 76.35.0 item Item No. 1: Columbus, OH → Columbus, OH, 60.94 ¢/bbl |
| Carrying cost | 0.454 | calculated | $3.720000/gal × 5.9400% ÷ 365 × 7.500 days (0.000 in transit, 2.50 waiting on the cycle, 5.00 in terminal inventory); transit estimated: 0 pipeline miles at 4.0 mph (general estimate) |
| Pipeline loss | 0.372 | estimate | flat estimate $0.0037/gal, applied 1 time |
| Terminaling | 1.500 | estimate | Flat estimate: no fee on file for this terminal |
| Product adder | 3.777 | Sum of the lines above, over the origin spot price |
Every published route, lowest adder first (12 of 12). Origins are priced at the same index here. "Origin must be cheaper by" is how far below the price at the origin of the route used above a route's own origin price has to be before that route wins.
| Origin | Pipeline | Delivery point | Line-haul | Carrying | Loss | Terminaling | Adder ¢/gal | Days | Origin must be cheaper by | Tariff |
|---|---|---|---|---|---|---|---|---|---|---|
| Columbus, OH | Marathon Pipe Line (MPLX) | Columbus, OH only point in the city | 1.45 | 0.45 | 0.37 | 1.50 | 3.78 | 7.5 | — | F.E.R.C. No. 76.35.0 item Item No. 1 |
| Lima | Buckeye Pipeline | COLUMBUS | 2.32 | 0.51 | 0.37 | 1.50 | 4.70 | 8.4 | 0.93 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Lima | Inland Corporation | Columbus only point in the city | 2.33 | 0.51 | 0.37 | 1.50 | 4.71 | 8.4 | 0.93 | FERC No. 31.38.0 item 1 |
| Heath, OH | Marathon Pipe Line (MPLX) | Columbus, OH only point in the city | 2.63 | 0.48 | 0.37 | 1.50 | 4.98 | 7.9 | 1.20 | F.E.R.C. No. 76.35.0 item Item No. 1 |
| Fostoria | Inland Corporation | Columbus only point in the city | 3.66 | 0.52 | 0.37 | 1.50 | 6.05 | 8.5 | 2.27 | FERC No. 31.38.0 item 1 |
| Toledo (incl. Cedar Point) | Inland Corporation | Columbus only point in the city | 3.71 | 0.54 | 0.37 | 1.50 | 6.13 | 8.9 | 2.35 | FERC No. 31.38.0 item 1 |
| Toledo | Buckeye Pipeline | COLUMBUS | 3.93 | 0.54 | 0.37 | 1.50 | 6.35 | 8.9 | 2.57 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Huntington | Buckeye Pipeline | COLUMBUS | 4.53 | 0.56 | 0.37 | 1.50 | 6.96 | 9.2 | 3.18 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Findlay starts part-way along the line | Buckeye Pipeline | COLUMBUS | 4.64 | 0.51 | 0.37 | 1.50 | 7.02 | 8.5 | 3.25 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Detroit | Buckeye Pipeline | COLUMBUS | 6.26 | 0.57 | 0.37 | 1.50 | 8.70 | 9.4 | 4.92 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Woodhaven | Buckeye Pipeline | COLUMBUS | 6.54 | 0.56 | 0.37 | 1.50 | 8.98 | 9.3 | 5.20 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
| Chicago Complex | Buckeye Pipeline | COLUMBUS | 7.97 | 0.64 | 0.37 | 1.50 | 10.48 | 10.6 | 6.71 | FERC No. 446.52.0 item Table 1 effective 2025: check for a newer filing |
Kept weekly, and whenever a tariff, terminal link, loss term or assumption changes. "What moved" compares each snapshot with the one before it.
| Snapshot | Product | Route | Adder ¢/gal | What moved |
|---|---|---|---|---|
| 2026-11-24 | Diesel | Columbus, OH · Marathon Pipe Line (MPLX) | 3.77 | carrying cost −0.04¢; pipeline loss −0.04¢ |
| 2026-11-24 | Gasoline | Columbus, OH · Marathon Pipe Line (MPLX) | 3.48 | carrying cost −0.01¢; pipeline loss −0.01¢ |
| 2026-11-17 | Diesel | Columbus, OH · Marathon Pipe Line (MPLX) | 3.85 | carrying cost −0.03¢; pipeline loss −0.02¢ |
| 2026-11-17 | Gasoline | Columbus, OH · Marathon Pipe Line (MPLX) | 3.51 | carrying cost −0.01¢; pipeline loss −0.01¢ |
| 2026-11-16 | Diesel | Columbus, OH · Marathon Pipe Line (MPLX) | 3.90 | first snapshot |
| 2026-11-16 | Gasoline | Columbus, OH · Marathon Pipe Line (MPLX) | 3.53 | first snapshot |
| Terminal | City | Miles | Products (inferred from supply) |
|---|---|---|---|
| MPLX Columbus (East) T-31-OH-3101 | Columbus, OH | 0.2 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-31-OH-3111 | Columbus, OH | 0.3 | gasoline distillate |
| Buckeye Terminals, LLC - Columbus T-31-OH-3105 | Columbus, OH | 0.4 | gasoline distillate jet fuel |
| MPLX Columbus (West) T-31-OH-3112 | Columbus, OH | 0.6 | gasoline distillate |
| BenchMark Biodiesel, Inc. T-31-OH-3129 | Columbus, OH | 0.6 | distillate |
| Energy Transfer Marketing & Terminals L.P. T-31-OH-3116 | Columbus, OH | 0.9 | gasoline distillate |
| CITGO - Dublin T-31-OH-3120 | Dublin, OH | 10.5 | gasoline distillate |
| MPLX Heath T-31-OH-3102 | Heath, OH | 33.6 | gasoline distillate |
| Buckeye Terminals, LLC - Dayton T-31-OH-3115 | Dayton, OH | 57.6 | gasoline distillate jet fuel |
| Kinder Morgan Liquids Terminals LLC T-31-OH-3106 | Dayton, OH | 57.7 | gasoline distillate |
| CITGO Petroleum Corporation - Dayton T-31-OH-3121 | Dayton, OH | 57.8 | gasoline distillate |
| Energy Transfer Marketing & Terminals L.P. T-31-OH-3117 | Dayton, OH | 57.8 | gasoline distillate |
| ERPC Lebanon T-31-OH-3118 | Lebanon, OH | 68.5 | gasoline distillate |
| MPLX Lima T-34-OH-3152 | Lima, OH | 73.9 | unknown |
| Buckeye Terminals, LLC - Lima South T-34-OH-3158 | Lima, OH | 74.9 | unknown |
| Lima Refining Company T-34-OH-3176 | Lima, OH | 75.1 | unknown |
| Buckeye Terminals, LLC - Lima North T-34-OH-3146 | Lima, OH | 75.1 | unknown |
| ERPC Todhunter T-31-OH-3119 | Middletown, OH | 77.3 | gasoline distillate |
| Norfolk Southern Railway Co End Terminal T-31-OH-3127 | Portsmouth, OH | 85.3 | gasoline distillate |
| Kinder Morgan Liquids Terminals LLC T-31-OH-3104 | Cincinnati, OH | 92.0 | unknown |
| MPLX Marietta T-31-OH-3103 | Marietta, OH | 96.7 | gasoline distillate |
| MPLX Covington T-61-KY-3263 | Covington, KY | 97.7 | gasoline distillate jet fuel |
By truck direct from Valero Renewable Fuels LLC (Bloomingburg, OH), about 36 road miles.
Assumptions: TOE (Round 2 adders, realistic transit)
| Cost line | ¢/gal | How |
|---|---|---|
| Basis | +0.00 | table · Origin-state discount to Chicago |
| Truck freight | +1.79 | estimated · 36 road mi × $4/loaded mi ÷ 8,000 gal |
| Wholesale margin | +0.00 | flat |
| Terminal charge | +1.15 | flat · Terminaling estimate |
| Carrying cost | +0.00 | calculated |
| Delivered over CHI | +2.94 |
| Origin | Move | Days | Basis ¢ | Delivered ¢/gal |
|---|---|---|---|---|
| Valero Renewable Fuels LLC Bloomingburg, OH | Truck · 36 road mi | <1 | +0.00 | +2.94 |
| ADM Decatur IL Decatur, IL | NS · Decatur, IL → Columbus, OH | 6.1 | -5.50 | +15.32 |
| Green Plains Madison LLC Madison, IL | NS · St. Louis, MO → Columbus, OH | 6.3 | -5.50 | +15.94 |
| Marquis Energy LLC Hennepin, IL | NS · Kankakee, IL → Columbus, OH | 6.2 | -5.50 | +15.96 |
| Show Me Ethanol Carrollton, MO | NS · Kansas City, MO → Columbus, OH | 8.4 | -5.50 | +17.15 |
| Guardian Lima LLC Lima, OH | NS · Sandusky, OH → Columbus, OH | 3.8 | +0.00 | +19.95 |
| Cardinal Ethanol LLC Union City, IN | NS · Muncie, IN → Columbus, OH | 3.8 | +0.00 | +20.17 |
| POET Biorefining - Leipsic LLC Leipsic, OH | NS · Ft Wayne, IN → Columbus, OH | 3.8 | +0.00 | +20.25 |
| One Earth Energy LLC Gibson City, IL | NS · Bloomington, IL → Columbus, OH | 6.0 | -5.50 | +20.26 |
| Central Indiana Ethanol LLC Marion, IN | NS · Marion, IN → Columbus, OH | 4.0 | +0.00 | +20.31 |
Destination rate group: Columbus, OH (NS) (Columbus is a listed station). Published single-car tank-car rates from the ethanol plants in each origin group, cheapest first — ¢/gal at 30,000 gal a car, line haul only. Delivery here assumes a rail or transload point in the group, then truck to the rack.
NSRQ 70120 price authority effective January 2, 2018, "subject to future increases" — current NS prices are published only through AccessNS. Not subject to fuel surcharge (note G556). Lanes to Norcross GA, Spartanburg SC, Alexandria VA and Pineville NC include transloading at the TBT (notes P949-P952).
| From rate group | Railroad | $/car | ¢/gal | Ethanol plants in the group | Tariff |
|---|---|---|---|---|---|
| Sandusky, OH | NS | 3,945 | 13.15 |
POET Biorefining - Fostoria LLC Fostoria, OH Guardian Lima LLC Lima, OH |
NSRQ 70120 item 1000 |
| Decatur, IL | NS | 3,984 | 13.28 |
ADM Decatur IL Decatur, IL |
NSRQ 70120 item 1000 |
| Muncie, IN | NS | 4,004 | 13.35 |
Cardinal Ethanol LLC Union City, IN POET Biorefining - Portland LLC Portland, IN POET Biorefining - Alexandria LLC Alexandria, IN |
NSRQ 70120 item 1000 |
| Marion, IN | NS | 4,028 | 13.43 |
POET Biorefining - North Manchester LLC North Manchester, IN POET Biorefining - Shelbyville LLC Shelbyville, IN Central Indiana Ethanol LLC Marion, IN |
NSRQ 70120 item 1000 |
| Ft Wayne, IN | NS | 4,028 | 13.43 |
The Andersons Marathon Holdings LLC Logansport, IN Valero Renewable Fuels LLC Bluffton, IN POET Biorefining - Leipsic LLC Leipsic, OH |
NSRQ 70120 item 1000 |
| Chicago, IL | NS | 4,067 | 13.56 | Chicago index barrels (CHI) | NSRQ 70120 item 1000 |
| Driftwood, PA | NS | 4,067 | 13.56 |
Pennsylvania Grain Prcsg LLC Clearfield, PA |
NSRQ 70120 item 1000 |
| Louisville, KY | NS | 4,067 | 13.56 |
Parallel Products Inc Louisville, KY |
NSRQ 70120 item 1000 |
| Elkhart, IN | NS | 4,067 | 13.56 |
South Bend Ethanol LLC South Bend, IN |
NSRQ 70120 item 1000 |
| St. Louis, MO | NS | 4,144 | 13.81 |
Green Plains Madison LLC Madison, IL Crysalis Biosciences Inc Sauget, IL |
NSRQ 70120 item 1000 |
| Lansing, MI | NS | 4,144 | 13.81 |
The Andersons Marathon Holdings LLC Albion, MI Carbon Green Bioenergy LLC Lake Odessa, MI |
NSRQ 70120 item 1000 |
| Kankakee, IL | NS | 4,166 | 13.89 |
Marquis Energy LLC Hennepin, IL |
NSRQ 70120 item 1000 |
| Kansas City, MO | NS | 4,309 | 14.36 |
Show Me Ethanol Carrollton, MO |
NSRQ 70120 item 1000 |
| Evansville, IN | NS | 4,676 | 15.59 |
Green Plains Mount Vernon LLC Mount Vernon, IN Valero Renewable Fuels LLC Mt Vernon, IN Grain Processing Corp Washington, IN |
NSRQ 70120 item 1000 |
| Knoxville, TN | NS | 4,676 | 15.59 |
Primary Products Investments LLC Loudon, TN |
NSRQ 70120 item 1000 |
| Bloomington, IL | NS | 5,474 | 18.25 |
One Earth Energy LLC Gibson City, IL Biourja Renewables LLC Peoria, IL |
NSRQ 70120 item 1000 |