# Borger Refinery (Phillips 66)

Borger Refinery (Phillips 66), Borger, TX. 149,000 bpd crude capacity (EIA-820). Injects into Phillips 66 Pipeline; reaches 29 delivery points and 24 terminals by published tariff. Crude supply, outlets, events.

- Location: Borger, TX
- Status: active
- Crude capacity: 149,000 bpd (EIA-820)
- Operator: Phillips 66
- Parent: Phillips 66 Company

## Pipelines it injects into
- Phillips 66 Pipeline at Borger (Phillips 66 Borger refinery), Hutchinson County (confirmed) — https://newtide.ai/supply/pipeline/phillips-66-pipeline/
- Phillips 66 Pipeline at Phillips (Rocky Station) (confirmed) — https://newtide.ai/supply/pipeline/phillips-66-pipeline/

## Tariff origin points in the same city (not confirmed as its injection points)
- Phillips 66 Pipeline at Borger (Phillips 66 Borger refinery) (same city) — https://newtide.ai/supply/pipeline/phillips-66-pipeline/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Phillips 66 Pipeline | 29 | 24 | 26.39 | 308.89 |

## Crude supply
- pipeline: Borger system (Phillips 66-owned) — Primary Phillips 66-owned crude pipeline system supplying medium and heavy sour crude to Borger.
- pipeline: Canyon Crossing Pipeline — Described as a third-party pipeline that supplies Borger with crude sourced from the Cushing hub. This line has not been confirmed in a primary document.
- pipeline: Panhandle/West Texas & Canadian crude pipelines — Described as receiving medium sour crude and NGLs by pipeline from the Texas Panhandle, Wyoming and Canada, and foreign crude over company-owned and common-carrier pipeline systems. The Wyoming and Canada supply has not been confirmed in a primary document.
- pipeline: Phillips Pipe Line Company, Crude Supply Division (T-1 10-36) — The refinery's Texas Railroad Commission Form R-1 for June 2026 books every barrel of crude received from Phillips Pipe Line Company, Crude Supply Division. The month's receipts were 5,023,943 bbl, equal to crude runs, about 167,000 b/d. The September 2024 form showed 4,469,528 bbl from the same deliverer.

## Product outlets
- pipeline: Gold Line — Phillips 66 Carrier LLC F.E.R.C. No. 8.19.0 names Borger, Texas as an origin, with rates to Wichita and Paola, Kansas. A joint tariff with NuStar (F.E.R.C. No. 7.14.0) carries Borger barrels on the same line to Kansas and Nebraska points such as Hutchinson and Norfolk. The line dates from 1930 and is planned to be reversed as part of the Western Gateway Pipeline project.
- pipeline: Borger to Amarillo Pipeline — Phillips 66 Carrier LLC Texas No. 8.17 sets a rate from Borger, Hutchinson County to Amarillo Station, Potter County. The pipeline's specification sheet lists the Phillips 66 Amarillo, Lubbock and Albuquerque terminals as destinations.
- pipeline: Borger-Denver Products Pipeline — Phillips 66 Pipeline LLC F.E.R.C. No. 33.37.0 names Phillips (Rocky Station), Texas as the origin, with rates to McKee Station, Texas and to La Junta and Denver, Colorado.
- pipeline: Borger to Denver PR Pipeline — WesTTex 66 Pipeline LLC F.E.R.C. No. 26.13.0 sets a rate from Phillips (Rocky Station), Texas to Denver, Colorado. The specification sheet in effect October 2026 lists gasoline grades and the Phillips 66 Denver terminal as the destination.
- pipeline: Western Gateway Pipeline (planned, not yet in service) — Planned products pipeline of about 1,300 miles, a joint venture of Phillips 66, Kinder Morgan and HF Sinclair. About 900 miles would be new build from Borger to Phoenix, AZ, using Kinder Morgan's existing SFPP East Line from El Paso to Phoenix and Tucson, with completion targeted for 2029. It is not in service and is not a current connection.
- pipeline: Phillips Pipe Line Company, Rocky Products Station — The refinery's Form R-1 for June 2026 shows 2,688,925 bbl of gasoline and 2,027,089 bbl of diesel delivered to Phillips Pipe Line Company's Rocky Products Station, with smaller volumes of propane and butane. This is where nearly all product leaves the plant by pipeline. Rocky Station is the tariff origin of the Borger-Denver and Borger to Denver PR lines.
- truck_rack: Phillips 66 Company Borger rack (IRS T-75-TX-2657) — The IRS terminal list shows T-75-TX-2657, Phillips 66 Company, at Spur 119 N., Borger. The refinery's Form R-1 for June 2026 reports 9,448 bbl of motor gasoline and 43,579 bbl of aviation gasoline delivered by truck and rail car combined, with no diesel that month. Truck and rail volumes are small next to the pipeline volumes.
- rail: Rail car loading at the refinery — The refinery's Form R-1 for June 2026 reports product deliveries under a combined 'Truck/ Rail Cars' line and is signed by the Supervisor, Specialties & Rail. The form does not split truck from rail. No crude or feedstock was received by truck or rail that month.
- pipeline: Company-owned and common-carrier product pipelines — Refined products distributed to customers in West Texas, New Mexico, Colorado and the Midcontinent region.

## Recent events
- 2025-09-09 — Phillips 66 announced a $1.4 billion agreement to acquire Cenovus Energy's remaining 50% interest in WRB Refining LP (Borger and Wood River refineries), ending the joint venture. Closing was expected in Q4 2025.
- 2024-04-01 — Fire broke out in one of the processing units at the Phillips 66 Borger Refinery around 11:20am. Two employees were injured and flown to hospital. The fire was out by 1:00pm and the refinery continued to operate.

---