Fuels refinery

Vertex Mobile (Saraland) Refinery

Vertex Refining Alabama LLC · Vertex (privately held since emerging from Chapter 11 in January 2025; owned by lenders including funds managed by BlackRock Financial Management, Highbridge Capital Management, Whitebox Advisors and CrowdOut Capital) · Saraland, AL

Operating PADD3 IRS refinery no. R-63-AL-0009 renewable diesel
Aerial view of the site Imagery: USDA, USGS The National Map (public domain)
bpd crude capacity · EIA 2026
88,000
pipelines it injects into
0
delivery points reachable
0
terminals on those points
0
terminals reachable by barge
38
events on record
15

Capability

Crude distillation 88,000 bpd operable, 88,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Conversion — makes gasoline and diesel from heavier oil

Hydrocracking — gas oil 28,273

Upgrading

Catalytic reforming — high pressure 21,000
Vacuum distillation 29,000 sd

Treating — meets sulfur specs

Hydrotreating — diesel 17,000 sd
Hydrotreating — kerosene & jet 18,000 sd
Hydrotreating — naphtha / reformer feed 26,700 sd

Production capacity · barrels per stream day

Isomerization isobutane · 1,150 b/sd Lubricants · 21,000 b/sd Sulfur · 33 short tons/day

Crude slate

Domestic light sweet crude. Louisiana grades (LLS, HLS, South Louisiana Sweet), WTI grades, Eagle Ford and Bakken arrive by water; Florida and south Alabama field crude (Jay, Goodway) arrives by pipeline. The hydrocracker can alternatively run bio-based feedstocks (soybean/corn oil, tallow, waste vegetable oils) when in renewable-diesel service.

Base oils

Capacity by API group from public operator, permit and filing documents; each row links its source. MEDIUM confidence, researched 2026-10-25. EIA-820 lubricants production capacity: 21,000 barrels per stream day (as of 2026-01-01).
Re-refined Group III · 2,750 b/d

What EIA's 21,000 b/sd lubricants figure is: Fuels & Lubes (Jul 8, 2026) reports that Vertex Refining Alabama's Saraland refinery 'reported 21,000 b/sd of lubricant capacity for the first time' in EIA's Jan 1, 2026 data after 'reporting none in the prior year's report', and attributes it to Vertex's November 2025 conversion of the refinery hydrocracker to Group III re-refined base oil production using vacuum gas oil from its Marrero, Louisiana plant. It is therefore not a Shell-era base oil unit: Shell described the site at the April 2022 sale as 'capable of producing base oils and chemicals feedstock' while producing ~70% distillate, gasoline and jet fuel plus VGO and LPG. Chain of events: Vertex bought the 75,000 bpd refinery effective April 1, 2022; converted the hydrocracker to renewable diesel (phase 1 target 8,000 bpd; completion reported April 2023); paused renewable diesel in May 2024; filed Chapter 11 in September 2024; returned the hydrocracker to conventional VGO service as of Oct 9, 2024; emerged from Chapter 11 as a private, lender-owned company in January 2025; and on Nov 20, 2025 announced the hydrocracker was online producing VTX-R4, a 4 cSt API Group III re-refined base oil (Argus, Nov 21, 2025); VTX-R6 (6 cSt) followed on Feb 18, 2026 (OGJ). Vertex's terminal network in Mobile and Cincinnati, Ohio supports distribution of the re-refined base oil (Lube Report, Dec 2, 2025). Vertex has not disclosed a nameplate or production rate for either grade; the capacity row is a TOE estimate from public reporting, labelled as such. Group III base oil is thus produced today on the hydrocracker, alongside gasoline, diesel and jet fuel. No company-stated base oil capacity for the re-refined operation was found; a separate 6,000 b/d conventional (crude-derived) Group III project is targeted for 2029.

API groupb/dAs publishedBasisIn effectSource
Re-refined Group III 2,750 2,750 b/d
TOE estimate: about 2,000 to 3,500 b/d of re-refined Group III at full feed, constrained by the used-oil VGO Marrero can supply; the midpoint is recorded. Vertex has not disclosed a nameplate (Argus, Nov 21, 2025; OGJ, Feb 19, 2026). EIA-820's 21,000 b/sd lubricants figure is the converted hydrocracker's stream-day capacity in lube service, not re-refined base oil output, and is shown separately.
estimate 2025-11-20 no public source
Process route
Re-refining (hydrotreating)
Feedstock
Used lubricating oil
Brands
VTX-R4, VTX-R6
Ships by
truck, vessel
Owners
Vertex Energy, Inc., owned by lender funds managed by BlackRock Financial Management, Highbridge Capital Management, Whitebox Advisors and CrowdOut Capital

Grades offered

GroupGradecSt @100 °CBrandSource
Re-refined Group III VTX-R4 (4 cSt) 4.0 VTX-R4 Lubes'n'Greases Lube Report medium
Re-refined Group III VTX-R6 (6 cSt) 6.0 VTX-R6 Fuels & Lubes medium

Base oil events and projects

  1. 2026-07-08 Other Re-refined Group III mobile-group-iii-rrbo

    EIA data as of Jan 1, 2026 show Vertex Refining Alabama's Saraland refinery reporting 21,000 b/sd of lubricant capacity for the first time (none the prior year), accounting for nearly all of the US increase to 285,545 b/sd; the article attributes it to the November 2025 conversion of the hydrocracker (built for renewable diesel in April 2023, paused 2024) to Group III re-refined base oil production. announced 2026-07-08 · actual 2026-07-08 Fuels & Lubes medium

  2. 2026-06-24 Expansion Group III mobile-conventional-group-iii

    Vertex approved a project to add 'an incremental 6,000 b/d of conventional Group III production capacity' at the 75,000 b/d Mobile complex, using a crude-derived VGO stream from the existing hydrocracker and a 'newly procured high-pressure lubricants hydrotreating unit'; 4 cSt plus 6 and 8 cSt grades; production 'slated to begin ... sometime in 2029'. Preliminary design complete. No permit cited. announced 2026-06-24 · public target 2029 · +6,000 b/d Oil & Gas Journal medium

  3. 2026-02-18 Other Re-refined Group III mobile-group-iii-rrbo

    Vertex announced VTX-R6 on Feb 18, 2026: a 6 cSt re-refined Group III base oil now in production at the 75,000 b/d Mobile complex alongside VTX-R4 (first commercial production November 2025), both from used motor oil collected through Vertex's network. 'Vertex did not reveal the Mobile refinery's current rates of production.' announced 2026-02-18 · actual 2026-02-18 Oil & Gas Journal medium

  4. 2025-11-20 Start-up Re-refined Group III mobile-group-iii-rrbo

    Vertex announced on Nov 20, 2025 that the Mobile refinery hydrocracker had come online producing VTX-R4, a 4 cSt re-refined API Group III base oil, from vacuum gas oil made at its Marrero, Louisiana used-oil re-refinery. 'The company has not disclosed a base oil nameplate capacity for the hydrocracker unit.' Market participants expected VTX-R4 to sell at a discount to other Group III grades until it holds full approvals for major uses. announced 2025-11-20 · actual 2025-11-20 Argus Media medium

  5. 2025-01-22 Ownership change Group not published

    Vertex Energy completed its Chapter 11 restructuring and emerged as a privately held company owned by lenders including funds managed by BlackRock Financial Management, Highbridge Capital Management, Whitebox Advisors and CrowdOut Capital; about USD320 million of prepetition debt eliminated, up to USD100 million exit financing, Mark Smith appointed CEO. announced 2025-01-22 · actual 2025-01-22 Fuels & Lubes medium

  6. 2024-10-09 Conversion Group not published mobile-renewable-diesel

    Vertex returned the previously converted renewable diesel hydrocracker at the 75,000 b/d Mobile complex to its original conventional service; as of Oct 9, 2024 the unit 'once again processed traditional vacuum gas oil' to yield conventional gasoline and diesel. announced 2024-10-09 · actual 2024-10-09 Oil & Gas Journal medium

  7. 2024-09-24 Other Group not published mobile-renewable-diesel

    Vertex Energy commenced Chapter 11 cases in the US Bankruptcy Court for the Southern District of Texas with an $80 million debtor-in-possession facility; the company had earlier in 2024 paused renewable diesel production at the Mobile refinery citing 'macroeconomic concerns'. announced 2024-09-24 · actual 2024-09-24 Ship & Bunker medium

  8. 2022-04-04 Conversion Group not published mobile-renewable-diesel

    At sale close Shell said the 91,000 bpd Mobile refinery 'is also capable of producing base oils and chemicals feedstock'; Vertex planned to invest USD85 million to modify the hydrocracking unit to produce renewable diesel, with work to conclude by year-end 2022, starting at about 10,000 bpd and rising to 14,000 bpd by mid-2023. announced 2022-04-04 · public target 2022-12 Fuels & Lubes medium

  9. 2022-04-01 Ownership change Group not published

    Vertex completed the acquisition of the 75,000 bpd Mobile refinery in Saraland, Alabama from Shell effective April 1, 2022 for $75.0 million cash plus $16.3 million of agreed capital expenditures and other items; the refinery 'processes heavy and sour crude to produce heavy olefin feed, regular gasoline, premium gasoline, jet fuel, and diesel fuel'. Includes the deep-water Blakeley Island Terminal and a Mobile truck rack. announced 2021-05-26 · actual 2022-04-01 Vertex Energy, Inc. via SEC EDGAR high

Not established from public sources: Vertex has not disclosed a nameplate or production rate for the re-refined Group III operation (Argus, Nov 21, 2025; OGJ, Feb 19, 2026); the capacity row is a labelled TOE estimate (2,000 to 3,500 b/d, midpoint recorded) and EIA-820's 21,000 b/sd lubricants figure is kept as the unit's reported stream-day capacity, not base oil output. Transport of Marrero VGO to Mobile is not stated in any source opened (barge likely but unsourced). Exact dates for the renewable diesel start-up (April 2023 per Fuels & Lubes) and pause (May 2024) are month-level only and sit in status_notes. Vertex's June 24, 2026 Business Wire release still returns HTTP 403, so the 6,000 b/d conventional Group III project is sourced to OGJ (June 25, 2026). No Alabama DEM permit reference found for the hydrocracker conversion or the 2029 project. No Shell-era base oil production documented.

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in marine Blakeley Island Terminal (Mobile River)
NOAA Coast Pilot 5 lists the Blakeley Island Terminal Wharf with 1,000 ft of berthing space and 40 ft depth alongside, for receipt and shipment of crude oil and petroleum products. It is still listed under Shell Chemical Co. The dock berths crude and product barges and ships up to Aframax size: 38 ft maximum draft, 900 ft length overall, 120,000 short tons deadweight. Crude landed here moves to the refinery by pipeline.
Waterborne domestic light sweet crude by ship and barge at Blakeley Island, from Louisiana terminals including St. James crude source
crude in barge Refinery dock (Chickasaw Creek)
The refinery dock on Chickasaw Creek loads and unloads barges. Barged crude and feedstock are pumped from the dock to tanks inside the refinery. Barges only: 300 ft maximum length, 10.6 ft maximum draft. Feedstock is also held in tanks across the creek at Chickasaw, which have truck, barge and rail access, and barged over to the dock.
Crude and feedstock barges unloaded at the refinery's own dock on Chickasaw Creek crude source
crude in pipeline Blakeley Island terminal connector pipeline
About 6 miles of pipeline tie the refinery to the Blakeley Island terminal on the Mobile River. Crude landed at the terminal is transferred to the refinery by pipeline, and a 10-inch products pipeline carries finished product from the refinery to the terminal. The terminal has 600,000 bbl of crude and product storage; three finished-product tanks hold 427,000 bbl.
Vertex's Blakeley Island terminal (Mobile River) crude source
crude in pipeline Genesis Alabama/Florida (Jay) Pipeline
Genesis's Alabama/Florida system (135 miles, 150,000 b/d) delivers Florida and south Alabama field crude and Walnut Hill rail-terminal crude to the Vertex refinery's Saraland Terminal at 135.85 cents/bbl (FERC 21.20.0, eff. 2026-07-01). The line's other delivery, Plains' ex-EOTT Ten Mile Point crude terminal in Mobile, has been embargoed since September 2024 for integrity assessments.
Jay and Walnut Hill (Santa Rosa County, FL) to the Saraland Terminal crude source
crude in rail Crude by rail via Genesis Walnut Hill terminal
This is a stated capability, not a confirmed current flow. Genesis says its Walnut Hill terminal, 40 miles north of Pensacola, can receive and unload crude oil unit trains, and the terminal is an origin on the Genesis line to the refinery. Vertex said in 2022 that it can move crude by rail through a third-party terminal. The pipeline leg costs 135.85 cents/bbl from Walnut Hill to Saraland (Genesis FERC 21.20.0, eff. 2026-07-01).
Unit trains to Walnut Hill, FL, then the Genesis Alabama/Florida pipeline to the Saraland Terminal crude source
products out truck rack Vertex Refining Alabama LLC truck rack (IRS terminal T-63-AL-2334)
Ten-lane automated truck rack on the refinery site with additive and dye injection and ethanol blending. It loads about 175 trucks a day of gasoline, diesel and jet fuel for the local market, with room for more. The IRS lists the terminal under Vertex Refining Alabama LLC at Saraland.
400 Industrial Parkway, Saraland, AL gasoline distillate jet fuel source
products out barge Refinery dock (Chickasaw Creek)
The refinery's own barge dock on Chickasaw Creek. Gasoline leaves by this dock, along with vacuum gas oil, vacuum tower bottoms, jet fuel and other refined products for local marine markets. Barges only: 300 ft maximum length, 10.6 ft maximum draft. The dock has 150,000 bbl of finished-product tankage and 80,000 bbl of feedstock tankage.
Refinery dock on Chickasaw Creek, tied to the refinery by pipeline gasoline jet fuel fuel oil source
products out marine Blakeley Island Terminal (Mobile River)
Deep-water terminal on the Mobile River tied to the refinery by a 10-inch products pipeline. NOAA Coast Pilot 5 lists the wharf for receipt and shipment of crude oil and petroleum products. Diesel and jet fuel leave here by barge and ship. The dock takes ships up to Aframax size: 38 ft maximum draft, 900 ft length overall, 120,000 short tons deadweight. Three finished-product tanks hold 427,000 bbl.
Blakeley Island Terminal Wharf, 30.7142 N 88.0375 W (1,000 ft, 40 ft depth) distillate jet fuel source
products out pipeline Blakeley Island Terminal pipeline (Vertex)
Private 10-inch products line, not a common carrier. It runs from the refinery to the Blakeley Island Crude and Products Terminal. Vertex's 2022 site visit text also lists pipeline connections to third-party terminals, which are not named.
At the refinery; runs to Vertex's Blakeley Island Crude and Products Terminal on the Mobile River distillate jet fuel source

Docks

The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.

Blakeley Island Terminal Wharf · crude in, products out

Berth Max draft Max length Max beam Air draft
Blakeley Island Terminal Wharf 38 ft 900 ft – –
  • Receipt and shipment of crude oil and petroleum products.
  • 1,000 ft of berthing space, 40 ft reported depth alongside, 15 ft deck height.
  • Vertex's Blakeley Island terminal. The Coast Pilot still lists Shell Chemical Co. as owner and operator.
  • Takes barges and ships up to Aframax size. The limits are the terminal's own, not a port authority limit.
  • Tied to the refinery by pipeline. Three finished-product tanks hold 427,000 bbl.
  • Position 30°42'51"N, 88°02'15"W.

Source: NOAA Coast Pilot 5, chapter 7; Vertex Form 8-K site visit commentary (2022), read 2026-10-11.

Refinery dock (Chickasaw Creek) · crude in, products out

Berth Max draft Max length Max beam Air draft
Refinery dock 10.6 ft 300 ft – –
  • Barges only. Loads and unloads barges.
  • Gasoline, vacuum gas oil, vacuum tower bottoms, jet fuel and other refined products out by barge to local marine markets.
  • Crude and feedstock barges in, pumped to tanks inside the refinery.
  • Owner Vertex Refining Alabama LLC.
  • 150,000 bbl of finished-product tankage and 80,000 bbl of feedstock tankage at the dock.

Source: Vertex Form 8-K site visit commentary (2022), read 2026-10-11.

Pipeline reach

No tariff origin point is linked to this refinery yet.

By water

From the refinery’s docks on Mobile River / Gulf ICW: 38 terminals supplied by barge on the same waterway or one it opens onto, in 9 rack markets. Inferred from terminal research — barge movements carry no public tariff.
WaterwayTerminalsNearest miFarthest mi
Mobile Bay / Gulf ICW12214
Mobile Bay / Theodore Ship Channel11818
Gulf ICW35357
Lower Mississippi River / Gulf Intracoastal Waterway1180180
Gulf Intracoastal Waterway13198666
Bayou Teche / Gulf Intracoastal Waterway2231232
Gulf Intracoastal Waterway / Galveston Bay1415415
Gulf Intracoastal Waterway / Houston Ship Channel1422422
Victoria Barge Canal / Gulf Intracoastal Waterway1552552
Gulf Intracoastal Waterway / Port of Harlingen3659660
All 38 barge-reachable terminals
TerminalLocationSupplied by barge onMiles
Center Point Chickasaw LLC - Chicksaw North Terminal Mobile, AL Mobile Bay / Gulf ICW 2
Petroleum Fuel & Terminal - Chickasaw Chickasaw, AL Mobile Bay / Gulf ICW 2
Barcliff LLC Mobile, AL Mobile Bay / Gulf ICW 4
Plains Marketing Terminal / Eott Energy Mobile, AL Mobile Bay / Gulf ICW 4
Dunhill Terminals Mobile, AL Mobile Bay / Gulf ICW 5
Petroleum Fuel & Terminal - Blakeley Mobile, AL Mobile Bay / Gulf ICW 5
Midstream Fuel Services, Incorporated - Martin Company Mobile, AL Mobile Bay / Gulf ICW 5
Zenith Energy US - Mobile Terminal Mobile, AL Mobile Bay / Gulf ICW 6
Radcliff/Economy Marine Services - Mobile North Mobile, AL Mobile Bay / Gulf ICW 6
Alabama Bulk Terminal LLC Mobile, AL Mobile Bay / Gulf ICW 7
Mers Inc Mobile, AL Mobile Bay / Gulf ICW 7
Martin Energy Services Mobile, AL Mobile Bay / Gulf ICW 14
Martin Operating Partnership. Theodore, AL Mobile Bay / Theodore Ship Channel 18
Mocar Oil Pensacola, FL Gulf ICW 53
TransMontaigne - Pensacola Pensacola, FL Gulf ICW 56
Transmontaigne Partners L.p. - Pensacola Terminal Pensacola, FL Gulf ICW 57
IMTT-Geismar Geismar, LA Lower Mississippi River / Gulf Intracoastal Waterway 180
Martin Operating Partnership, L.P. Amelia, LA Gulf Intracoastal Waterway (Amelia / Bayou Boeuf) 198
Five Star Fuels Baldwin, LA Gulf Intracoastal Waterway (Baldwin / Bayou Teche corridor) 218
Anse La Butte Terminal Breaux Bridge, LA Bayou Teche / Gulf Intracoastal Waterway 231
Breaux Bridge Terminal Breaux Bridge, LA Bayou Teche / Gulf Intracoastal Waterway 232
Martin Operating Partnership, L.P. Gueydan, LA Gulf Intracoastal Waterway (Gueydan / Vermilion Parish) 278
PORT NECHES TERMINAL PORT NECHES, TX Gulf Intracoastal Waterway (Matagorda Bay) 355
Martin Operating Partnership, L.P. Galveston, TX Gulf Intracoastal Waterway / Galveston Bay 415
Oil Tanking Texas City Texas City, TX Gulf Intracoastal Waterway / Houston Ship Channel 422
CITGO - Victoria Victoria, TX Victoria Barge Canal / Gulf Intracoastal Waterway 552
Martin Operating Partnership Aransas Pass, TX Gulf Intracoastal Waterway (Corpus Christi area) 573
Bay Ltd Redfish Bay Terminal Aransas Pass, TX Gulf Intracoastal Waterway 584
Port Isabel Logistical Offshore Terminal Port Isabel, TX Gulf Intracoastal Waterway (Lower Laguna Madre) 645
ABC Gulf Coast Terminal Brownsville, TX Gulf Intracoastal Waterway (to Brownsville) 657
CITGO - Brownsville Brownsville, TX Gulf Intracoastal Waterway 657
TransMontaigne - SouthWest Brownsville, TX Gulf Intracoastal Waterway 658
Sunoco LLC Bronwsville, TX Gulf Intracoastal Waterway (to Brownsville) 658
Titan Fuel Terminals Harlingen, TX Gulf Intracoastal Waterway / Port of Harlingen 659
NuStar Logistics, L.P. - Harlingen, TX Harlingen, TX Gulf Intracoastal Waterway / Port of Harlingen 660
Port Harlingen Terminal Harlingen, TX Gulf Intracoastal Waterway / Port of Harlingen (Arroyo Colorado) 660
Titan Fuel Terminal Harlingen, TX Gulf Intracoastal Waterway (to Harlingen) 660
Bluewing One Brownsville, TX Gulf Intracoastal Waterway 666

Substitutes

No other refinery shares a tariff system with this one in our data.

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2026-07-08 Other Re-refined Group III

    EIA data as of Jan 1, 2026 show Vertex Refining Alabama's Saraland refinery reporting 21,000 b/sd of lubricant capacity for the first time (none the prior year), accounting for nearly all of the US increase to 285,545 b/sd; the article attributes it to the November 2025 conversion of the hydrocracker (built for renewable diesel in April 2023, paused 2024) to Group III re-refined base oil production. source

  2. 2026-06-24 Expansion Group III

    Vertex approved a project to add 'an incremental 6,000 b/d of conventional Group III production capacity' at the 75,000 b/d Mobile complex, using a crude-derived VGO stream from the existing hydrocracker and a 'newly procured high-pressure lubricants hydrotreating unit'; 4 cSt plus 6 and 8 cSt grades; production 'slated to begin ... sometime in 2029'. Preliminary design complete. No permit cited. source

  3. 2026-02-18 Other Re-refined Group III

    Vertex announced VTX-R6 on Feb 18, 2026: a 6 cSt re-refined Group III base oil now in production at the 75,000 b/d Mobile complex alongside VTX-R4 (first commercial production November 2025), both from used motor oil collected through Vertex's network. 'Vertex did not reveal the Mobile refinery's current rates of production.' source

  4. 2025-11-20 Start-up Re-refined Group III

    Vertex announced on Nov 20, 2025 that the Mobile refinery hydrocracker had come online producing VTX-R4, a 4 cSt re-refined API Group III base oil, from vacuum gas oil made at its Marrero, Louisiana used-oil re-refinery. 'The company has not disclosed a base oil nameplate capacity for the hydrocracker unit.' Market participants expected VTX-R4 to sell at a discount to other Group III grades until it holds full approvals for major uses. source

  5. 2025-01-22 Ownership change Group not published

    Vertex Energy completed its Chapter 11 restructuring and emerged as a privately held company owned by lenders including funds managed by BlackRock Financial Management, Highbridge Capital Management, Whitebox Advisors and CrowdOut Capital; about USD320 million of prepetition debt eliminated, up to USD100 million exit financing, Mark Smith appointed CEO. source

  6. 2025-01 ownership

    Vertex emerged from Chapter 11 as a privately held company owned by lenders including funds managed by BlackRock Financial Management, Highbridge Capital Management, Whitebox Advisors and CrowdOut Capital. Argus reported the exit on 22 January 2025, with a commitment of up to $100 million in financing and $320 million of prepetition debt removed. source

  7. 2024-10-09 turnaround

    Hydrocracker restarted in conventional service after a catalyst-change turnaround, producing gasoline and diesel again. source

  8. 2024-10-09 Conversion Group not published

    Vertex returned the previously converted renewable diesel hydrocracker at the 75,000 b/d Mobile complex to its original conventional service; as of Oct 9, 2024 the unit 'once again processed traditional vacuum gas oil' to yield conventional gasoline and diesel. source

  9. 2024-09-24 outage

    Vertex Energy filed for Chapter 11 bankruptcy and explored a sale of the refinery. source

  10. 2024-09-24 Other Group not published

    Vertex Energy commenced Chapter 11 cases in the US Bankruptcy Court for the Southern District of Texas with an $80 million debtor-in-possession facility; the company had earlier in 2024 paused renewable diesel production at the Mobile refinery citing 'macroeconomic concerns'. source

  11. 2024-05-09 outage

    Vertex announced it would pause renewable diesel production and convert the hydrocracker back to conventional fuels, citing weak renewable-diesel margins expected to persist. source

  12. 2023-05 expansion

    Vertex completed a ~$115M project converting the mild hydrocracker to renewable diesel production (Phase 1 RDCP). source

  13. 2022-04-04 Conversion Group not published

    At sale close Shell said the 91,000 bpd Mobile refinery 'is also capable of producing base oils and chemicals feedstock'; Vertex planned to invest USD85 million to modify the hydrocracking unit to produce renewable diesel, with work to conclude by year-end 2022, starting at about 10,000 bpd and rising to 14,000 bpd by mid-2023. source

  14. 2022-04-01 sale

    Vertex Energy completed acquisition of the Mobile, AL refining and petrochemical complex from Shell. source

  15. 2022-04-01 Ownership change Group not published

    Vertex completed the acquisition of the 75,000 bpd Mobile refinery in Saraland, Alabama from Shell effective April 1, 2022 for $75.0 million cash plus $16.3 million of agreed capital expenditures and other items; the refinery 'processes heavy and sour crude to produce heavy olefin feed, regular gasoline, premium gasoline, jet fuel, and diesel fuel'. Includes the deep-water Blakeley Island Terminal and a Mobile truck rack. source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.