# Valero Ardmore Refinery

Valero Ardmore Refinery, Ardmore, OK. 86,000 bpd crude capacity (EIA-820). Injects into Magellan Midstream; reaches 73 delivery points and 67 terminals by published tariff. Crude supply, outlets, events.

- Location: Ardmore, OK
- Status: active
- Crude capacity: 86,000 bpd (EIA-820)
- Operator: Valero Refining Company - Oklahoma
- Parent: Valero Energy Corporation

## Pipeline outlets named by research (no confirmed connection yet)
- Magellan Midstream at Wynnewood, OK / Ardmore, OK (Valero Partners Wynnewood) (research) — https://newtide.ai/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Magellan Midstream | 73 | 70 | 217.31 | 530.28 |

## Crude supply
- pipeline: Wasson - Ardmore Crude Pipeline — Sunoco LP lists this line as running 38.48 miles from Wasson Station to the Ardmore Refinery with 90,000 barrels per day of capacity. Valero's May 2025 fact sheet says the plant predominantly receives Permian Basin and Cushing-sourced crude by pipelines.

## Product outlets
- pipeline: Magellan Pipeline — Magellan does not connect at the refinery. Magellan's joint tariff FERC No. 197.9.0, effective July 2026, moves product on Valero Partners Wynnewood, LLC from Ardmore, OK to the interconnection at Wynnewood, OK, and from there on Magellan to its destinations. Valero's March 2020 fact sheet said products also move by railcar and tank truck.
- truck_rack: Ergon Asphalt & Emulsions, Inc. - Ardmore — Ergon lists an asphalt emulsions location at 2500 Refinery Rd in Ardmore. Its page gives the address and the grades sold and does not say where the asphalt comes from. A supply link from the refinery is not documented.
- truck_rack: Valero Refining Company - Oklahoma (IRS terminal T-73-OK-2600) — The IRS terminal list shows T-73-OK-2600 under Valero Refining Company - Oklahoma at Hwy 142 Bypass, Ardmore, OK 73402. This is the refinery's own terminal number.

## Recent events
- 2025-06 — The turnaround concluded.
- 2025-04 — A major turnaround began. It was larger than the 2023 turnaround, with about 20 percent more people and about 10 percent more time. Contractor headcount peaked near 1,200 against about 90 on a routine day.

---