Valero Benicia Refinery, Benicia, CA. 145,000 bpd crude capacity (EIA-820). Status: idled. Tariff origin points in its city on Kinder Morgan SFPP; reaches 5 delivery points by published tariff. Crude supply, outlets, events.

- Location: Benicia, CA
- Status: idled — The refinery is idled and is not producing. Valero states a throughput capacity of 170,000 bpd; EIA records 145,000 barrels per calendar day, a different measurement basis. The Bay Area AQMD Title V permit limited crude to 180,000 barrels on any day and 165,000 bpd as an annual average, as stated in the City of Benicia's 2014 Draft EIR. All three figures are historical. On April 16, 2025 Valero reported that it had notified the California Energy Commission of its intent to idle, restructure or cease refining at Benicia by the end of April 2026, and recorded a combined $1.1 billion impairment on Benicia and Wilmington. On April 24, 2025 Valero confirmed it would cease refining operations, citing California's regulatory environment. On January 6, 2026 the Governor's Office reported Valero's updated plan: the refinery would idle, keep producing gasoline through April 2026, and Valero would then keep importing gasoline into Northern California. Valero's site states that full idling of all processing units was completed in April 2026. Valero says it is maintaining permits, keeping the plant in a safe condition and evaluating redevelopment while supplying Northern California through imports and other arrangements.
- Crude capacity: 145,000 bpd (EIA-820)
- Operator: Valero Refining Company - California
- Parent: Valero Energy Corporation

## Tariff origin points in the same city (not confirmed as its injection points)
- Kinder Morgan SFPP at Benicia (same city) — https://newtide.ai/supply/pipeline/kinder-morgan-sfpp/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Kinder Morgan SFPP | 5 | 6 | 32.36 | 33.50 |

## Crude supply
- pipeline: Crude pipeline from the San Joaquin Valley (pipeline not named) — The City of Benicia's 2014 Draft EIR states that crude produced in California, primarily in the San Joaquin Valley, was delivered into the refinery by pipeline. The document does not name the pipeline or its operator.
- marine: Valero Benicia Marine Oil Terminal (Carquinez Strait) — Crude from the United States and abroad, including Canada, was delivered by vessel to Valero's own marine terminal on the Carquinez Strait and pumped to the refinery's crude tanks (2014 Draft EIR). The terminal was built in 1968 and unloaded about 31 million barrels in 2019 and about 33 million in 2020. NOAA Coast Pilot 7 lists receipt of crude oil at the wharf.
- rail: UPRR crude-by-rail (Valero Crude by Rail project, proposed) — The Valero Crude by Rail project was a proposal to receive up to 70,000 bpd of crude by tank car. The 2014 Draft EIR states that the refinery then received crude only by pipeline and marine vessel and had no unloading rail spurs. No document shows the unloading facility was built.

## Product outlets
- pipeline: Kinder Morgan SFPP — Benicia is an origin point in SFPP's intrastate tariff Cal PUC No. 161, effective July 1, 2026, priced jointly with Richmond to Oakland, Oakland International Airport, Brisbane and San Francisco International Airport. Kinder Morgan's March 2025 Pacific Operations brochure shows Valero feeding Concord Station and Amorco Station in its Bay Area and North Lines gathering diagram. The brochure says the Concord and Richmond gathering systems connect refineries and third-party terminals to destinations in the Bay Area, northern and central California, and Reno, Nevada.
- marine: Valero Benicia Marine Oil Terminal (Carquinez Strait) — The wharf that received crude also loaded and unloaded petroleum products by tanker and barge. It was mainly a receiving dock: it loaded 3.2 million barrels and unloaded 30.9 million in 2019, and loaded 2.8 million and unloaded 32.6 million in 2020.
- rail: Union Pacific Railroad — The 2014 Draft EIR states that the Union Pacific line gives rail access to the refinery, which used rail to ship asphalt, petroleum coke and LPG and to bring in refining chemicals. Up to 12 railcars of petroleum coke a day left on Track 700 across Park Road to the neighbouring port terminal for loading to ships. The refinery tracks served the coke silo and LPG transfers.
- truck_rack: Valero Refining Company - California truck rack (IRS terminal T-68-CA-4603) — The IRS active fuel terminals list dated August 30, 2026 carries T-68-CA-4603, Valero Refining Company - Benicia, 3410 East Second Street, Benicia. Valero's specialty products page states that asphalt is marketed from its refineries and terminals by barge, rail and truck.

## Recent events
- 2026-04 — Full idling of all processing units at the Benicia refinery completed, per Valero's own site.
- 2026-01-06 — The Governor's Office reported Valero's updated plan for Benicia: idle the refinery, keep producing gasoline through April 2026, then keep importing gasoline into Northern California once the refinery is fully idle.
- 2025-04-24 — Valero confirmed it would cease refining operations at Benicia, citing California's regulatory/enforcement environment and declining fuel-supply/high-gasoline-price concerns.
- 2025-04-16 — Valero notified the California Energy Commission of intent to idle, restructure, or cease refining operations at Benicia by end of April 2026; recorded a combined $1.1B pre-tax impairment on Benicia and Wilmington.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/valero-refining-co-california-benicia-ca/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.