# TotalEnergies Port Arthur Refinery

TotalEnergies Port Arthur Refinery, Port Arthur, TX. 238,000 bpd crude capacity (EIA-820). Injects into Colonial Pipeline, Enterprise / TEPPCO and Explorer Pipeline; reaches 55 delivery points and 67 terminals by published tariff. Crude supply, outlets, events.

- Location: Port Arthur, TX
- Status: active
- Crude capacity: 238,000 bpd (EIA-820)
- Operator: TotalEnergies Petrochemicals & Refining USA, Inc.
- Parent: TotalEnergies SE

## Pipelines it injects into
- Colonial Pipeline at Total Tie-In, Port Neches, Jefferson County, TX (research) — https://newtide.ai/supply/pipeline/colonial-pipeline/
- Enterprise / TEPPCO at Port Neches (Jefferson Co., TX) (research) — https://newtide.ai/supply/pipeline/enterprise-teppco/
- Explorer Pipeline at Port Neches (Jefferson County, TX) (research) — https://newtide.ai/supply/pipeline/explorer-pipeline/

## Tariff origin points in the same city (not confirmed as its injection points)
- Colonial Pipeline at Port Arthur Products Station (same city) — https://newtide.ai/supply/pipeline/colonial-pipeline/
- Enterprise / TEPPCO at North Port Arthur (Jefferson Co., TX) - interconnect with Enterprise Refined Products storage (same city) — https://newtide.ai/supply/pipeline/enterprise-teppco/
- Magellan Midstream at Port Arthur / Port Neches, TX (via Explorer) (same city) — https://newtide.ai/supply/pipeline/magellan-midstream/
- Sunoco / Energy Transfer at Port Arthur (Motiva Refinery or Enterprise Products Terminal) (same city) — https://newtide.ai/supply/pipeline/sunoco-energy-transfer/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Explorer Pipeline | 24 | 35 | 100.30 | 285.10 |
| Enterprise / TEPPCO | 15 | 22 | 192.70 | 346.30 |
| Magellan Midstream | 9 | 8 | 603.88 | 686.75 |
| Colonial Pipeline | 4 | 4 | 11.42 | 25.63 |
| Sunoco / Energy Transfer | 3 | 3 | 28.53 | 192.25 |

## Reach by barge (inferred)
44 terminals supplied by barge from docks on Sabine-Neches Waterway, in 9 rack markets.

## Crude supply
- pipeline: ETP Crude pipeline (Energy Transfer) — ETP Crude LLC's Texas tariff TX No. 14.5.0, effective July 1, 2026, lists crude petroleum from the ETNT Nederland Terminal to the Total Petrochemicals Refinery at 31.77 cents a barrel. The tariff does not state crude grades.
- marine: Sabine-Neches Waterway — NOAA Coast Pilot 5 lists the Port Arthur Terminal No. 1 Dock, on the south side of the Neches River, for receipt and shipment of crude oil, xylene, naphtha and petroleum products.

## Product outlets
- pipeline: Colonial Pipeline — Colonial's local tariff FERC 3.33.0, effective July 1, 2026, lists Route 02 from the Total Tie In at Port Neches to the Port Arthur Products Station. The tariff limits Route 02 to distillate products. Route 01 of the same tariff carries product on to Colonial with a pump-over charge.
- marine: Sabine-Neches Waterway — NOAA Coast Pilot 5 lists three docks for receipt and shipment of petroleum products. No. 1 Dock (900 ft berthing space, 40 ft alongside) also handles crude oil, xylene and naphtha. No. 1 Dock A (550 ft, 35 ft) handles benzene and toluene, and Dock B (500 ft, 30 ft) handles asphaltene, xylene, benzene and toluene. Fuel oil from the refinery has been used to supply marine bunker fuel at Port Arthur and Beaumont.
- truck_rack: Total Petrochemicals USA Incorporated - Par Truck Rack — The Texas Commission on Environmental Quality Statement of Basis for the refinery's operating permit O1267 lists a truck loading rack, an LPG loading rack and an asphalt plant and loading rack. The rack has no IRS terminal control number in the operator's name. The products loaded at the truck rack are not established.
- pipeline: Explorer Pipeline — Explorer's area sketch 000-SK-1079 (Port Neches - Port Arthur Area) shows origin meter N01 TOTAL on a 12-inch line to Port Neches Junction and Explorer's 14-inch line to Port Arthur Station. The sketch does not state which products move.
- rail: Refinery rail loading — The refinery's Texas operating permit O1267 carries a rail loading unit for material other than LPG and gasoline with a true vapor pressure below 0.5 psia. The permit does not name the product or the serving railroad.
- pipeline: TEPPCO / Enterprise TE Products Pipeline — Regional network serving Beaumont/Port Arthur; a Total-specific citation was not found within budget.

## Recent events
- 2026 — A lightning strike disrupted the refinery's power supply, causing a complete site-wide loss of electricity and unplanned shutdown; TotalEnergies targeted a full restart afterward.
- 2024-02 — TotalEnergies' 238,000-bpd Port Arthur refinery shut down again just two days after restarting, struggling to maintain production including its 60,000-bpd coker and 35,000-bpd reformer.
- 2024 — TotalEnergies' 2024 annual results cited unplanned shutdowns, notably at Port Arthur, and a loss-of-steam event, as reasons group refining utilization (83%) missed the 85% target.
- 2023-09-05 — Fire in the pyrolysis gasoline unit at the co-located BASF TotalEnergies Petrochemicals JV led to collapse of an extractive distillation tower; contained within ~3 hours, no injuries. This is the adjacent petrochemical JV, not the refinery's crude-processing units, but the JV site remained shut for an extended period afterward.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/totalenergies-petrochem-refg-usa-port-arthur-tx/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.
