# Suncor Energy Commerce City Refinery -- Plant 2 (East)

Suncor Energy Commerce City Refinery -- Plant 2 (East), Commerce City East, CO. 36,000 bpd crude capacity (EIA-820). Crude supply, outlets, events.

- Location: Commerce City East, CO
- Status: active
- Crude capacity: 36,000 bpd (EIA-820)
- Operator: Suncor Energy (USA) Inc.
- Parent: Suncor Energy Inc. (Canada)

## Crude supply
- truck: Truck unloading at the refinery — The EPA notice of violation of July 2, 2024 says incoming crude oil is received by truck or by pipeline. It describes the refinery as a whole and does not split receipts between the plants or name the pipeline.

## Product outlets
- truck_rack: Suncor Energy (U.S.A.) Inc. Plant 2 truck loading dock (IRS T-84-CO-4101) — Plant 2 has its own truck loading dock with a flare (emission point C001) under its air permit 95OPAD108, as described in EPA's letter of March 25, 2022. IRS terminal T-84-CO-4101 is at 5800 Brighton Boulevard, the East Plant's address; the match is by address. EPA's order of July 31, 2023 lists Plant 2's products as gasoline, diesel fuel and asphalt, but no document states what the truck dock loads.
- rail: Plant 2 railcar loading dock — Plant 2 has its own railcar dock with a flare (emission point C002). EPA's order of July 31, 2023 describes LPG loading at the rail rack and says the plant ceased loading gasoline there. The serving railroad is not named.

## Recent events
- 2026-09 — Colorado preparing tougher rules and a crackdown on Suncor pollution (headline only, Colorado Sun 2026-09-10).
- 2026-05 — A third-party power outage caused an unplanned operational shutdown of units at the Commerce City refinery, with flaring and smoke (Reuters via TradingView; Denverite 2026-05-11).
- 2026-04-15 — Plant 2 shutdown and flaring from a 'possible electrical issue' sent heavy black smoke over north Denver; Plants 1 and 3 were already down for maintenance.
- 2026-03-17 — Suncor began planned maintenance at the 98,000 b/d Commerce City refinery; Plants 1 and 3 were offline for planned maintenance in April 2026.
- 2026-02-02 — A petition was filed with EPA against the reopened Plant 2 Title V permit.
- 2025-12-05 — CDPHE issued the reopened Title V permit 95OPAD108 for Plant 2.
- 2024-07-02 — EPA and CDPHE issued Notice of Violation CAA-08-2024-0010 for air pollution violations at the Commerce City refinery. The notice covers all three plants.
- 2024-02 — CDPHE announced Suncor must pay at least $10.5 million in penalties and projects for July 2019 to June 2021 air violations (Colorado's largest single-facility package), and must double its fenceline monitoring.

---