# Valero Port Arthur Refinery

Valero Port Arthur Refinery, Port Arthur, TX. 385,000 bpd crude capacity (EIA-820). Injects into Colonial Pipeline, Explorer Pipeline and Sunoco / Energy Transfer; reaches 63 delivery points and 67 terminals by published tariff. Crude supply, outlets, events.

- Location: Port Arthur, TX
- Status: active
- Crude capacity: 385,000 bpd (EIA-820)
- Operator: Premcor Refining Group Inc. (operating subsidiary of Valero Refining Company / Valero Energy)
- Parent: Valero Energy Corporation

## Pipelines it injects into
- Colonial Pipeline at Port Arthur Products Station (research) — https://newtide.ai/supply/pipeline/colonial-pipeline/
- Explorer Pipeline at Port Arthur (Jefferson County, TX) (research) — https://newtide.ai/supply/pipeline/explorer-pipeline/

## Pipeline outlets named by research (no confirmed connection yet)
- Sunoco / Energy Transfer at Port Arthur (Motiva Refinery or Enterprise Products Terminal) (research) — https://newtide.ai/supply/pipeline/sunoco-energy-transfer/

## Tariff origin points in the same city (not confirmed as its injection points)
- Enterprise / TEPPCO at North Port Arthur (Jefferson Co., TX) - interconnect with Enterprise Refined Products storage (same city) — https://newtide.ai/supply/pipeline/enterprise-teppco/
- Magellan Midstream at Port Arthur / Port Neches, TX (via Explorer) (same city) — https://newtide.ai/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Explorer Pipeline | 33 | 41 | 96.30 | 310.00 |
| Enterprise / TEPPCO | 15 | 22 | 204.70 | 351.08 |
| Magellan Midstream | 9 | 8 | 603.88 | 686.75 |
| Colonial Pipeline | 3 | 3 | 20.13 | 26.39 |
| Sunoco / Energy Transfer | 3 | 3 | 28.53 | 192.25 |

## Crude supply
- marine: Sabine-Neches Waterway — NOAA Coast Pilot 5 (October 2026 edition) lists the refinery's Berths Nos. 0 to 6 for receipt and shipment of crude oil. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 3,338,590 barrels of crude imported from Mexico that month.
- pipeline: Nederland to Port Arthur crude pipeline — RBN Energy states Nederland terminal has direct pipeline connections to the Valero and Total Port Arthur refineries in addition to Motiva and ExxonMobil Beaumont.
- pipeline: Keystone Pipeline — Keystone/Marketlink barrels reach the Nederland hub; the Port Neches Link spur was purpose-built for Motiva specifically, so a direct Keystone-to-Valero-PA connection is plausible via Nederland terminal blending/redelivery but not separately confirmed by a Valero-specific source.
- pipeline: The Premcor Pipeline Co. crude line — The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 7,375,100 barrels of crude received from The Premcor Pipeline Co. (pipeline registration T-1 03-1065). That was about 7.4 of the 10.7 million barrels of crude received that month. The report does not name the line or where it starts.

## Product outlets
- truck_rack: Premcor Refining Group Inc. (Valero) refinery rack, IRS terminal T-76-TX-2854 — The IRS terminal list carries T-76-TX-2854 under Premcor Refining Group Inc. at 1801 Gulfway Dr, Port Arthur. The list has no Valero LP record in Port Arthur. The products loaded at the rack are not stated.
- pipeline: Explorer Pipeline — Explorer sketch 000-SK-1079 (revised April 2022) shows the 30-inch Valero gasoline and oil meters A03 and A04 and El Vista feeding Port Arthur Station. Colonial FERC 3.33.0 (effective July 1, 2026) Route 03 prices the movement from the Port Arthur Products Station to Explorer Pipeline. The refinery's Railroad Commission report for May 2024 shows 5.5 million barrels of gasoline and diesel delivered to the Port Arthur Products Station.
- pipeline: Colonial Pipeline — Colonial FERC 3.33.0 (effective July 1, 2026) Route 01 is a pump over charge for movements from the Port Arthur Products Station into Colonial Pipeline. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 2,849,632 barrels of gasoline and 2,643,640 barrels of diesel delivered to the Port Arthur Products Station.
- pipeline: Sunoco Pipeline (Energy Transfer) — Sunoco Pipeline L.P. tariff TX No. 80.12 lists the origin Hebert, Jefferson County, Texas (Valero Pipeline), with rates to the Hebert Tank Farm and Center Terminal. The refinery's Railroad Commission of Texas Form R-1 for May 2024 reports 339,150 barrels of gasoline and 382,685 barrels of diesel delivered to Sunoco Pipeline.
- marine: Premcor Refining Group Port Arthur Refinery Berths Nos. 0 to 6 — NOAA Coast Pilot 5 (October 2026 edition) lists Berths Nos. 0 to 6 for receipt and shipment of crude oil, petroleum products, petrochemicals and liquid caustic soda, owned by Premcor Refining Group, Inc. It does not break the products down by grade. A separate refinery wharf is listed for shipment of liquid sulphur.

## Recent events
- 2026-09 — Power outage following storm Edouard hit the Port Arthur refinery; smaller AVU-147 crude unit was shut and the larger AVU-146 CDU ran at minimum rates.
- 2026-03-23 — Explosion and ~5-hour fire at the diesel hydrotreater (unforeseen process-fluid release) forced a full shutdown of the 380,000-435,000 bpd refinery; no injuries reported. Partial restart underway through April 2026; diesel hydrotreater rebuild timeline unknown as of late April 2026, kerosene hydrotreater targeted for Q3 2026.
- 2024-12 — A fire was reported at Valero's Port Arthur plant, referenced later by trade press covering the 2026 explosion. Its scope and duration are not stated.
- 2023 — Valero completed a coker project at Port Arthur, raising crude throughput capacity to ~435,000 bpd and improving heavy/high-resid crude upgrading capability.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/premcor-refining-group-inc-port-arthur-tx/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-26.
