# Phillips 66 Los Angeles Refinery - Wilmington site

Phillips 66 Los Angeles Refinery - Wilmington site, Wilmington, CA. 83,400 bpd crude capacity (EIA-820). Status: closed. Crude supply, outlets, events.

- Location: Wilmington, CA
- Status: closed — Closure announced October 16, 2024, with phased idling through 2025. Final crude processing at the Carson site occurred mid-October 2025. Phillips 66's refining page states the Los Angeles Refinery 'has been idled' and the company is pursuing redevelopment (Wilmington: 'Five Points Union' project; Carson: 'Diamond Gateway' project). Layoffs began December 2025. The City of Los Angeles project description for Five Points Union (August 2025) says all units will stay in an idled and preserved condition during the environmental review and entitlement process, and the plant's air, water and waste permits will be kept during that time. In its October 2024 notice Phillips 66 said it will supply gasoline from sources inside and outside its refining network, and renewable diesel and sustainable aviation fuel from its Rodeo complex.
- Crude capacity: 83,400 bpd (EIA-820)
- Operator: Phillips 66 Company
- Parent: Phillips 66 (NYSE: PSX)

## Crude supply
- pipeline: Intermediate-product pipeline from the Carson crude unit (intra-complex, ~5 miles) — Wilmington did not receive crude oil. It received intermediate fractions produced off site, by pipeline from the Carson plant, and processed them into finished fuels. The City of Los Angeles project description (August 2025) says the first step of crude separation is typically completed off site. The refinery has since been idled.
- pipeline: Line 2000 (Pacific Pipeline) — Line 2000/Pacific Pipeline is a long-established heavy-crude line historically supplying Los Angeles-area refineries (including the former ARCO/Tosco/ConocoPhillips Carson-Wilmington complex) from Kern County; no source found confirming current-day (2024-2025) use immediately before shutdown, so treated as plausible/historical rather than confirmed-current.
- marine: Phillips 66 Marine Oil Terminal, Port of Los Angeles Berths 148-151 — The plant received intermediate fractions over the Phillips 66 marine terminal as well as by pipeline. The Port of Los Angeles document for the terminal (February 2023) says neither crude oil nor LPG is loaded or unloaded there, and that its commodities move by pipeline between the terminal and the Carson and Wilmington plants. The refinery has since been idled.

## Product outlets
- pipeline: SFPP (Kinder Morgan) — Kinder Morgan's Pacific Operations brochure of March 2025 shows a line from 'Phillips 66 Wilmington' into Watson Station on its diagram of the San Diego and West Line gathering facilities. The diagram does not list the products. It dates from before the plant was idled.
- marine: Phillips 66 Marine Oil Terminal, Port of Los Angeles Berths 148-151 — Products moved by pipeline from the plant to the terminal and out by tanker. The Port of Los Angeles document (February 2023) says the largest vessels calling are Panamax tankers with typical maximum loads of about 75,000 deadweight tons, and that the terminal does not serve the refinery exclusively. This describes the terminal before the plant was idled.
- barge: Phillips 66 Marine Oil Terminal, Port of Los Angeles Berths 148-151 — The same terminal handles barges as well as tankers. The Port of Los Angeles document (February 2023) counts 296 barge calls and 17 tanker calls in 2021. This describes the terminal before the plant was idled.
- rail: Pacific Harbor Line — The City of Los Angeles project description (August 2025) says the rail lines on the site are served by the Pacific Harbor Line under a Spur Track Agreement and carry fuel inputs and products to and from the plant. It does not say which commodities moved by rail.
- pipeline: Regional refined-products pipelines (unspecified operator) — No source found naming a specific outbound products-pipeline operator/name for the Wilmington finishing site; general references only describe the complex as a major Southern California fuel supplier prior to closure.

## Recent events
- 2025-12 — Layoffs begin, affecting union, non-union and contractor positions as the refinery complex winds down.
- 2025-10-01 — Phillips 66 books ~$100M in charges (including ~$70M for groundwater mitigation) as it winds down the refinery; several process units already placed in idle state, remaining units idled in phases through end of 2025; final crude processing expected mid-October 2025.
- 2024-10-16 — Phillips 66 announces plan to permanently cease crude processing and close the Los Angeles Refinery (Carson + Wilmington) by Q4 2025, citing market fundamentals rather than California regulation.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/phillips-66-company-wilmington-ca/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.