Bayway Refinery (Phillips 66), Linden, NJ. 275,000 bpd crude capacity (EIA-820). Injects into Buckeye Pipeline and Colonial Pipeline; reaches 34 delivery points and 50 terminals by published tariff. Crude supply, outlets, events.

- Location: Linden, NJ
- Status: active
- Crude capacity: 275,000 bpd (EIA-820)
- Operator: Phillips 66 Company
- Parent: Phillips 66 (NYSE: PSX)

## Pipelines it injects into
- Buckeye Pipeline at Linden (research) — https://newtide.ai/supply/pipeline/buckeye-pipeline/

## Pipeline outlets named by research (no confirmed connection yet)
- Colonial Pipeline at Carteret (Middlesex County) - NE short haul (research) — https://newtide.ai/supply/pipeline/colonial-pipeline/

## Tariff origin points in the same city (not confirmed as its injection points)
- Sunoco / Energy Transfer at Linden (Harbor PL) (same city) — https://newtide.ai/supply/pipeline/sunoco-energy-transfer/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Buckeye Pipeline | 25 | 42 | 167.95 | 243.31 |
| Colonial Pipeline | 7 | 11 | 47.82 | 47.82 |
| Sunoco / Energy Transfer | 2 | 4 | 38.64 | 47.19 |

## Crude supply
- marine: Phillips 66 Bayway marine docks, Arthur Kill — EPA's 2021 inspection report says crude is supplied by tanker from Canada and West Africa, with U.S. crude supplied by rail and marine transport. In August 2026 Phillips 66 said it used its chartered vessels with the Jones Act waiver to substitute foreign crudes.
- rail: Phillips 66 Bayway crude rail terminal — A railcar crude receiving facility at the refinery with about 75,000 b/d of capacity, built for Phillips 66 Partners. EPA's 2021 inspection report says U.S. crude is supplied by rail. A 2013 report on the planned facility placed it in the Conrail Shared Assets Area, which CSX Transportation and Norfolk Southern both reach.

## Product outlets
- pipeline: Buckeye Pipeline — EPA's 2021 inspection report says about one third of Bayway's product leaves through the Buckeye pipeline connection. Buckeye's Directory of Connecting Facilities (November 2024) lists the refinery owner at Linden under the old name ConocoPhillips.
- truck_rack: Phillips 66 Pipeline truck racks: Tremley Point (T-22-NJ-1512) and Linden (T-22-NJ-1514) — EPA's 2021 inspection report says about one third of Bayway's product leaves through its two truck loading terminals, Linden and Tremley Point. Tremley Point has an 11-bay rack, with nine bays loading gasoline and diesel and two unloading ethanol. A separate rack there has three propane bays and one butane bay.
- marine: Phillips 66 Bayway marine loading dock, Arthur Kill — EPA's 2021 inspection report says about one third of Bayway's product leaves over the refinery's marine loading dock.
- barge: Phillips 66 Bayway marine loading dock, Arthur Kill — Phillips 66 says refined products are distributed to East Coast customers by pipeline, barge, railcar and truck. Which products move by barge is not stated.
- rail: Railcar loading at Bayway — Phillips 66 says refined products are distributed to East Coast customers by pipeline, barge, railcar and truck. Which products leave by railcar is not stated.
- pipeline: Colonial Pipeline — Linden, NJ is Colonial Pipeline's documented mainline terminus (operational Houston-to-Linden since Dec 1963), located at/adjacent to the Bayway complex. This is fundamentally a delivery point bringing Gulf Coast-refined products INTO the Linden/NY Harbor market (an 'Intra Harbor Transfer' hub), not crude oil supply out of Bayway or necessarily a Bayway-originated products shipment -- so as a directional crude/product edge tied to the refinery itself it should be treated with caution even though the physical Colonial infrastructure at Linden is very well documented.

## Recent events
- 2025-08-14 — A fire in ancillary equipment near the fluid catalytic cracker cut gasoline output. Phillips 66 expected to return to full production within days.
- 2025-07 — A storm power outage caused a partial shutdown at Bayway. Phillips 66 bought fuel on the open market to cover the shortfall, which added to a brief New York Harbor price spike.
- 2025 — Bayway Crude Tower Project completed during the first quarter 2025 turnaround, adding about 40,000 b/d of ability to switch between heavy and light crude.

---