# Marathon Garyville Refinery

Marathon Garyville Refinery, Garyville, LA. 617,000 bpd crude capacity (EIA-820). Injects into Bengal Pipeline, Colonial Pipeline, Marathon Pipe Line (MPLX) and 1 more; reaches 59 delivery points and 101 terminals by published tariff. Crude supply, outlets, events.

- Location: Garyville, LA
- Status: active
- Crude capacity: 617,000 bpd (EIA-820)
- Operator: Marathon Petroleum Company LP
- Parent: Marathon Petroleum Corporation

## Pipelines it injects into
- Bengal Pipeline at Garyville (Saint John the Baptist Parish) (research) — https://newtide.ai/supply/pipeline/bengal-pipeline/
- Colonial Pipeline at Norco (Saint Charles Parish, LA) (research) — https://newtide.ai/supply/pipeline/colonial-pipeline/
- Marathon Pipe Line (MPLX) at Garyville (St. John the Baptist Parish), LA (research) — https://newtide.ai/supply/pipeline/marathon-pipe-line-mplx/
- Plantation Pipeline at Garyville (St. John the Baptist Parish), via Marathon Pipe Line (joint tariff 156.29.0) (confirmed) — https://newtide.ai/supply/pipeline/plantation-pipeline/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Plantation Pipeline | 29 | 106 | 175.67 | 257.17 |
| Marathon Pipe Line (MPLX) | 28 | 4 | 91.04 | 255.35 |
| Bengal Pipeline | 2 | 0 | 69.98 | 69.98 |

## Reach by barge (inferred)
60 terminals supplied by barge from docks on Mississippi River / Gulf ICW, in 19 rack markets.

## Crude supply
- pipeline: Capline Pipeline — Marathon Pipe Line operates Capline and says the reversal was completed in 2021, with Garyville among the destinations in the St. James market hub. The operator says southbound service opened supply from Canada.
- pipeline: St. James to Garyville crude pipeline — Marathon confirmed in March 2009 that a crude pipeline from St. James supplies the refinery. The line was shut at that time after a blast and the plant kept running on crude on hand.
- pipeline: Louisiana Offshore Oil Port (LOOP) / LOCAP Pipeline — Offshore Technology says the refinery receives heavy sour crude via the river and the Louisiana Offshore Oil Port. LOOP crude reaches the plant by pipeline through St. James, not over a dock. No tariff naming Garyville as a LOCAP delivery point has been found.
- marine: Marathon Garyville ship dock (Dock 5) — AECOM's project page for the Dock 5 expansion says the added ship dock spans about 1,100 feet along the Mississippi River and handles most of the incremental crude receipts of the expanded refinery.

## Product outlets
- pipeline: Marathon Pipe Line (MPLX) — Marathon Pipe Line FERC No. 302.19.0, effective July 1, 2026, carries products from Garyville to the Products (SE) Pipe Line station at Baton Rouge and to Hardin Street Transportation at Zachary Junction, East Feliciana Parish. A footnote sets a charge for transfer from Zachary Junction to Colonial Pipeline at Baton Rouge Junction.
- pipeline: Bengal Pipeline — Bengal Pipeline FERC 19.25.0, effective July 1, 2026, lists Garyville as a point of origin with rates to the Colonial Pipeline Junction at the Baton Rouge Product Station and to the Plantation Pipeline Junction in East Baton Rouge Parish.
- pipeline: Plantation Pipeline — Garyville is a named origin in the Plantation joint tariff with Marathon Pipe Line (Products (SE) Pipe Line FERC No. 156.29.0, effective July 1, 2026), with destinations in Alabama, Georgia, Mississippi, the Carolinas, Tennessee and Virginia. Bengal Pipeline also has a rate from Garyville to the Plantation Pipeline Junction.
- pipeline: Colonial Pipeline — There are two tariffed routes. Bengal Pipeline carries product from Garyville to the Colonial Pipeline Junction at the Baton Rouge Product Station. Marathon Pipe Line carries product to Zachary Junction, with a transfer from there to Colonial at Baton Rouge Junction for an added charge.
- truck_rack: Marathon Garyville Refining Logistics rack (IRS T-72-LA-2418) — The IRS terminal list of August 30, 2026 shows Garyville Refining Logistics at 155 Sugarcane Road, Garyville. Marathon states that products leave the refinery by transport truck. The IRS list has a second Garyville terminal, T-72-LA-2363, and no document says which one holds the light products rack.
- truck_rack: Garyville MPC Asphalt Terminal — Company-named on-site asphalt terminal -- direct company asset.
- marine: Marathon Garyville Docks 1, 2 and 5 — Marathon states that products leave the refinery by ocean tanker. Moran Shipping lists three docks: Docks 1 and 2 take ships to 900 ft length and 100,000 tons displacement, and Dock 5 to 920 ft and 125,000 tons. Which docks load products is not stated.
- barge: Marathon Garyville docks (barge loading) — Marathon states that products leave the refinery by barge. The products and the docks used are not stated.
- rail: Rail loading at the refinery — Marathon states that products leave the refinery by rail. The railroad and the products moved are not stated.
- pipeline: Centennial Pipeline — Centennial's Louisiana segment runs Beaumont, TX to Longville, LA (western/central LA) and north to Illinois -- it does not pass through or originate at Garyville (St. John the Baptist Parish, on the river between New Orleans and Baton Rouge). No source ties Garyville product to Centennial.

## Recent events
- 2024-09 — Regulators (state/EPA) reported 20 alleged safety-related breakdowns at Garyville following the 2023 tank fires.
- 2023-08-25 — Major naphtha/diesel storage-tank fire (two tanks, one holding 150,000 bbl sour naphtha, spread to an adjacent 300,000 bbl diesel tank); units shut, 2-mile evacuation ordered then lifted; restart began Aug 28. Described by Marathon as the third blaze at the plant in less than a year.
- 2022-02-21 — Fire/explosion at the refinery, extinguished same day; five contract workers injured.
- 2021-08-29 — Sustained damage in Hurricane Ida; shut in ahead of landfall, ran on generators during repairs, restarted by Sept. 10, 2021.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/marathon-petroleum-co-lp-garyville-la/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.