# HF Sinclair El Dorado Refinery

HF Sinclair El Dorado Refinery, El Dorado, KS. 162,000 bpd crude capacity (EIA-820). Injects into HF Sinclair / Holly Energy, Magellan Midstream and NuStar Pipeline; reaches 68 delivery points and 62 terminals by published tariff. Crude supply, outlets, events.

- Location: El Dorado, KS
- Status: active
- Crude capacity: 162,000 bpd (EIA-820)
- Operator: HF Sinclair El Dorado Refining LLC
- Parent: HF Sinclair Corporation

## Pipelines it injects into
- Magellan Midstream at Kansas (El Dorado) (research) — https://newtide.ai/supply/pipeline/magellan-midstream/
- NuStar Pipeline at El Dorado, KS (research) — https://newtide.ai/supply/pipeline/nustar-pipeline/

## Pipeline outlets named by research (no confirmed connection yet)
- HF Sinclair / Holly Energy at HF Sinclair El Dorado, KS refinery (confirmed) — https://newtide.ai/supply/pipeline/hf-sinclair-holly-energy/

## Tariff origin points in the same city (not confirmed as its injection points)
- Magellan Midstream at Kansas (Coffeyville/El Dorado/Kansas City Jct.) (same city) — https://newtide.ai/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Magellan Midstream | 63 | 62 | 122.26 | 379.75 |
| NuStar Pipeline | 4 | 3 | 72.82 | 82.77 |
| HF Sinclair / Holly Energy | 1 | 0 | 8.88 | 8.88 |

## Crude supply
- pipeline: Cushing Pipeline Interconnect — HF Sinclair states its Mid-Continent refineries (El Dorado and Tulsa) are connected by pipeline to the Cushing, OK hub; El Dorado is about 125 miles from Cushing and has direct access to Cushing crude, including Canadian-origin barrels reaching Cushing.

## Product outlets
- pipeline: NuStar East Products Pipeline — NuStar Pipeline Operating Partnership, L.P. FERC No. 17.47.0 lists El Dorado, Kansas as a point from which rates apply on its East system (Items 100, 110, 120). The company's annual report says the refinery ships product on the NuStar pipeline to the northern Plains states.
- pipeline: Magellan Pipeline — Holly Energy Partners - Operating, L.P. FERC No. 65.19.0 (effective 2026-07-01) carries product from the refinery to El Dorado East, KS, where Magellan Pipeline Company takes it on its Mountain system to Denver, CO under joint tariff FERC No. 163.21.0. The Holly Energy Partners tariff covers unleaded gasoline, commercial and military jet fuel, distillates and gasoline feedstock. The company's annual report also names a Magellan mid-continent pipeline to the Plains states.
- truck_rack: Holly Energy Partners - Operating L.P. El Dorado truck rack (T-48-KS-3654) — The IRS terminal list shows Holly Energy Partners - Operating L.P. at South Haverhill Road, El Dorado, KS 67042 as terminal T-48-KS-3654. It is the only IRS terminal in El Dorado, KS.
- pipeline: NuStar Energy - El Dorado Station — Consistent with the NuStar pipeline connection above; likely the same physical NuStar interconnect represented as a terminal node.

## Recent events
- 2025-01 — El Dorado refinery lost power and shut down due to Winter Storm Blair.
- 2025 — HF Sinclair cut processing rates at El Dorado due to repairs, per sources.
- 2025 — Planned turnaround work at El Dorado cited by HF Sinclair as reducing quarterly system-wide crude throughput guidance.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/hf-sinclair-el-dorado-refining-llc-el-dorado-ks/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-26.