Flint Hills Resources LP (Koch Industries, Inc. subsidiary) · Koch Industries, Inc. · Corpus Christi East, TX
Crude distillation 87,500 bpd operable, 87,500 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
| Catalytic cracking (FCC) | 47,700 |
| Hydrotreating — naphtha / reformer feed | 33,000 sd |
Not documented at the East plant level.
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | KPL South Texas crude system (Koch Pipeline) The September 2024 RRC Form R-1 shows 10,630,487 bbl of crude received from Koch Pipeline Co. The report covers the East and West plants together, so this is a complex-level figure. The delivery point at the East plant is not shown. |
Koch Pipeline Company system (RRC T-1 03-1141). Origin stations are not stated in the report. | crude | source |
| crude in | marine | Flint Hills Resources East Plant Tanker Docks No. 3 and No. 2 The Corps of Engineers describes Dock No. 3 as receiving crude oil and Dock No. 2 as receiving crude oil occasionally. Moran Shipping lists crude among the cargoes handled at both berths. The September 2024 R-1 shows no crude receipt other than from Koch Pipeline, so no recent waterborne crude volume is shown. |
Not stated | crude | source |
| products out | pipeline | Flint Hills Resources Texas Pipeline System Flint Hills states that the Texas Pipeline System carries products from the Corpus Christi refineries to the San Antonio, Austin, Bastrop, Waco and Dallas/Fort Worth markets. The September 2024 R-1 shows gasoline, distillate and jet fuel delivered to Flint Hills Resources, LC (RRC T-1 04-015). This is a complex-level fact. Where East plant product enters the system is not stated. |
Corpus Christi refineries. East and West are reported as one refinery to the RRC (R-1 04-3718). | gasoline distillate jet fuel | source |
| products out | truck rack | Flint Hills Resources East Refinery truck rack TCEQ's compliance history for the East Refinery names a Truck Rack and a Truck Rack Flare at the plant. What the rack loads is not stated. No IRS terminal number is listed at this address on the IRS terminal list of 8/30/2026. |
1607 Nueces Bay Boulevard, Corpus Christi | source | |
| products out | marine | Flint Hills Resources East Plant Tanker Docks No. 2 and No. 3 The Corps of Engineers describes both tanker docks as receiving and shipping petroleum products and petrochemicals. Moran Shipping lists the cargoes handled as vacuum gas oil, gasoil, light cycle oil, chemicals and diesel oil. Gasoline and jet fuel are not on those cargo lists. TCEQ also names Docks and a Marine Vapor Combust Unit at the East Refinery. |
Right bank of the Industrial Canal, Corpus Christi, at Nueces Bay Boulevard extended | distillate petrochemical feedstocks | source |
| products out | barge | Flint Hills Resources East Plant Barge Dock No. 1 The Corps of Engineers describes this barge dock as receiving and shipping petrochemicals and shipping petroleum products. Depth alongside is 16 ft and berthing space is 230 ft. The petroleum products shipped are not named. |
Right bank of the Industrial Canal, Corpus Christi, about 200 feet above Nueces Bay Boulevard extended | petrochemical feedstocks | source |
The docks at this facility and, where a ship agent or port publishes it, the largest vessel each berth takes. Channel conditions change; these figures are a guide, not clearance to sail.
| Berth | Max draft | Max length | Max beam | Air draft |
|---|---|---|---|---|
| FHR # 3 | 34 ft | 929 ft | – | – |
Source: U.S. Army Corps of Engineers dock records; Moran Shipping berth page, read 2026-10-11.
| Berth | Max draft | Max length | Max beam | Air draft |
|---|---|---|---|---|
| FHR # 2 | 37 ft | 750 ft | – | – |
Source: U.S. Army Corps of Engineers dock records; Moran Shipping berth page, read 2026-10-11.
Source: U.S. Army Corps of Engineers dock records, read 2026-10-11.
This refinery injects at tariff origin points, but those systems’ rates haven’t been transcribed yet.
Other refineries injecting into the same pipelines — the supply that could backfill an outage here.
A power outage at Flint Hills Resources' Corpus Christi refinery complex (reported as 365,000 b/d) triggered more than 24 hours of flaring, per a TCEQ filing reported by OPIS; not attributable to East vs. West plant specifically. source
TCEQ findings agreed order, Docket 2022-1543-AIR-E, for the Flint Hills Resources East Refinery at 1607 Nueces Bay Boulevard. Total penalty assessed was $60,500. The order was published in the Texas Register on 26 July 2024. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.