# Ergon Refining Vicksburg Refinery

Ergon Refining Vicksburg Refinery, Vicksburg, MS. 26,500 bpd crude capacity (EIA-820). Crude supply, outlets, events.

- Location: Vicksburg, MS
- Status: active
- Crude capacity: 26,500 bpd (EIA-820)
- Operator: Ergon Refining Inc. (ERI)
- Parent: Ergon, Inc.

## Reach by barge (inferred)
25 terminals supplied by barge from docks on Mississippi River, in 12 rack markets.

## Crude supply
- marine: Barge receipt at Ergon Refining Docks No. 1, No. 2 and No. 3 — The U.S. Army Corps of Engineers dock records list receipt of crude oil at all three Ergon Refining docks. Docks No. 1 and No. 2 are on Vicksburg Harbor and Dock No. 3 is on the Yazoo River Diversion Canal, a harbor off the Mississippi River and not the main stem. The records date from an older port survey.
- marine: Imported crude entered at the customs port of Baton Rouge, LA — EIA company-level import records for 2024 to 2026 show crude from the United Kingdom and Angola entered at Baton Rouge for processing at Ergon Refining Inc, Vicksburg. The importer of record is the affiliate Ergon Oil Purchasing Inc. Cargoes run about 440 to 510 thousand barrels, several a year.

## Product outlets
- truck_rack: Refinery/terminal truck rack — ERI already markets 'a full slate of gasoline and diesel fuel products' from the Vicksburg fuels terminal it purchased in 2023, implying an active truck-rack operation there; not separately documented as a distinct refinery-gate rack.
- barge: Ergon Refining Docks No. 1, No. 2 and No. 3 — The U.S. Army Corps of Engineers dock records list shipment of diesel fuel over Dock No. 1, petroleum products over Dock No. 2 and asphalt over Dock No. 3. Base oils are not named separately. The records date from an older port survey.
- truck_rack: Ergon Refining Inc fuels terminal truck rack (IRS T-64-MS-2419, ex-CITGO) — The IRS active terminal list dated 8/30/2026 shows T-64-MS-2419, Ergon Refining Inc, at 1585 Haining Road. This is the fuels terminal Ergon Refining bought from CITGO in 2023, next to the refinery at 2125 Haining Road. The terminal has its own barge dock, which the Army Corps record lists for receipt of petroleum products.
- rail: Rail loading at the Ergon Refining tank terminal — The Army Corps dock records show four surface tracks serving the terminal behind Docks No. 1 and No. 2, connecting with Kansas City Southern Railway. The 2024 state water permit names a rail loading rack at the ERI Terminal. The products loaded to rail are not stated.
- pipeline: New refinery-to-terminal pipeline (under construction as part of 2025 expansion) — As part of the $400M expansion announced March 2025, ERI is building pipeline infrastructure connecting the refinery directly to its adjacent Vicksburg fuels terminal (acquired from Citgo Petroleum Corp. in September 2023) to support wholesale gasoline/diesel marketing in western Mississippi and eastern Louisiana. Expected online with the rest of the expansion in Q1 2027.
- pipeline: Ergon Refining Inc. Vicksburg fuels terminal (ex-CITGO Petroleum Vicksburg terminal)

## Recent events
- 2026-04-10 — Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by a further $0.55 per gallon effective 2026-04-10, again citing Middle East developments.
- 2026-03-27 — Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by $0.35 per gallon effective 2026-03-27, citing developments in the Middle East.
- 2026-03-10 — Magnolia Marine Transport (Ergon's Vicksburg-based heated petroleum barge carrier) added three towboats and nine barges. This is fleet context for the refinery's barge logistics, not a refinery event.
- 2025-09-01 — Ergon announced planned fall maintenance at the Vicksburg naphthenic refinery starting 2025-09-01, with various operating units down for approximately six weeks for reliability improvements; inventories sufficient and no supply interruptions expected for ratable customers. No completion notice was found.
- 2025-05-09 — Ergon decreased North American prices for HyVolt dielectric fluids, HyGold base oils and HyPrene process oils by $0.20 per gallon effective 2025-05-09.
- 2025-03-26 — OGJ reported the proposed $400 million project at ERI's 26,500-b/d specialty naphthenic base oil refinery: +20% crude distillation, +6,000 b/d gasoline, a combined heat and power plant and a pipeline to the Vicksburg fuels terminal; completion first-quarter 2027.
- 2025-03-25 — Ergon announced a $400 million expansion of Ergon Refining Inc.'s Vicksburg, MS refinery: a 20% increase in crude distillation capacity (from the existing 26,500 bpd) and installation of new gasoline-production capability (~6,000 bpd) to supply wholesale fuels markets in western Mississippi and eastern Louisiana, plus a new dual cogeneration power complex. Includes new pipeline infrastructure connecting the refinery to ERI's adjacent Vicksburg fuels terminal. Supported by Mississippi Development Authority road-improvement assistance. Expected completion Q1 2027; creates 20 new permanent jobs.
- 2025-03-25 — ERI announced plans to expand processing capabilities at Vicksburg to include gasoline production (nearly 6,000 b/d) with crude distillation capacity rising 20%, expected online in the first quarter of 2027; includes pipeline infrastructure to the adjacent fuels terminal Ergon bought in August 2023. No change to naphthenic base oil capacity is stated. Target recorded as 2027-03 for 'first quarter 2027'.

## Base oils
- Base oil capacity: Group V naphthenic 26,500 b/d
- EIA-820 lubricants production capacity: 23,000 b/sd (as of 2026-01-01)
- Status: operating — Operator page states 'production capacity of up to 26,500 barrels per day of severely hydrotreated naphthenic specialty products' (naphthenic base and process oils), with ULSD, naphtha, heavy fuel oil, asphalt blending stocks and waxes also offered; Ergon calls itself 'the world's leading producer of specialty naphthenic oils' (March 25, 2025 release). A $400 million gasoline expansion (nearly 6,000 b/d gasoline, +20% crude distillation) is due online Q1 2027; the operator release does not say whether naphthenic base oil output changes. Planned six-week maintenance began 2025-09-01 with no supply interruption expected. Classification: naphthenic base oils are API Group V under API 1509 (their VI sits below the 80 floor Groups I–III require, even where hydrotreating meets Group II sulfur and saturates limits); market tallies that file them with Group I are a convention. Recorded here as Group V naphthenic. The $400 million project cost comes from trade and local press (OGJ, WJTV), not Ergon's release.
- Operator: Ergon Refining, Inc. (ERI)
- Parent: Ergon, Inc. (private, Flowood/Jackson MS)
- Process: Naphthenic hydrotreating
- Brands: HyGold, HyPrene, HyVolt, HyPrint
- Grades: HyGold naphthenic base oils, viscosity range 40 SUS to 4,900 SUS (blending capability) (Group V naphthenic), HyPrene naphthenic process oils, viscosity range 40 SUS to 4,900 SUS (Group V naphthenic), HyVolt naphthenic insulating oils meeting IEC 60296 ed.5 (2020) and ASTM D3487-2016 (Group V naphthenic)

### Base oil events
- 2026-04-10 — Posted price change, Group V naphthenic: Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by a further $0.55 per gallon effective 2026-04-10, again citing Middle East developments. — https://legacy.ergon.com/updates/bergon-to-increase-naphthenic-prices-in-north-americab-07-04-26
- 2026-03-27 — Posted price change, Group V naphthenic: Ergon increased North American naphthenic prices (HyVolt, HyGold, HyPrene) by $0.35 per gallon effective 2026-03-27, citing developments in the Middle East. — https://legacy.ergon.com/updates/ergon-to-increase-naphthenic-prices-in-north-america-24-03-26
- 2025-09-01 — Turnaround, Group V naphthenic: Ergon announced planned fall maintenance at the Vicksburg naphthenic refinery starting 2025-09-01, with various operating units down for approximately six weeks for reliability improvements; inventories sufficient and no supply interruptions expected for ratable customers. No completion notice was found. (public target 2025-10) — https://ergon.com/bergon-announces-planned-fall-maintenance-for-mississippi-refineryb-02-06-25/
- 2025-05-09 — Posted price change, Group V naphthenic: Ergon decreased North American prices for HyVolt dielectric fluids, HyGold base oils and HyPrene process oils by $0.20 per gallon effective 2025-05-09. — https://ergon.com/ergon-to-decrease-naphthenic-prices-in-north-america-06-05-25/
- 2025-03-26 — Other: OGJ reported the proposed $400 million project at ERI's 26,500-b/d specialty naphthenic base oil refinery: +20% crude distillation, +6,000 b/d gasoline, a combined heat and power plant and a pipeline to the Vicksburg fuels terminal; completion first-quarter 2027. (public target 2027-03) — https://ogj.com/refining-processing/refining/capacities/article/55277704/ergon-expanding-crude-processing-capacity-at-mississippi-refinery
- 2025-03-25 — Expansion: ERI announced plans to expand processing capabilities at Vicksburg to include gasoline production (nearly 6,000 b/d) with crude distillation capacity rising 20%, expected online in the first quarter of 2027; includes pipeline infrastructure to the adjacent fuels terminal Ergon bought in August 2023. No change to naphthenic base oil capacity is stated. Target recorded as 2027-03 for 'first quarter 2027'. (public target 2027-03) — https://ergon.com/updates/bergon-refining-to-expand-processing-capabilities-for-gasoline-productionb-25-03-25
- 2021-10-23 — Turnaround, Group V naphthenic: Scheduled fall maintenance at the Vicksburg naphthenic refinery began 2021-10-23; Ergon announced completion 2021-11-16 with reliability improvements made, all units running and no supply interruptions. Inventories were raised beforehand. — https://ergon.com/fall-maintenance-completed-at-ergons-vicksburg-refinery-16-11-21/
- 2021-08-30 — Other, Group V naphthenic: Ergon stated its Vicksburg naphthenic refinery on the Mississippi River was not impacted by Hurricane Ida, was fully operational, and customers should not expect supply chain disruptions. — https://ergon.com/ergon-refining-statement-regarding-hurricane-ida-30-08-21/
- 2020-04-20 — Turnaround, Group V naphthenic: Scheduled turnaround at the Vicksburg naphthenic refinery completed; last unit returned to service 2020-04-20 after the schedule was extended for COVID-19 precautions. Ergon reported no supply interruptions. — https://ergon.com/ergon-refining-turnaround-complete/
- Research: MEDIUM confidence, 2026-10-25, public sources only

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/ergon-refining-inc-vicksburg-ms/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.