# Pemex Deer Park Refinery (Deer Park Refining Limited Partnership)

Pemex Deer Park Refinery (Deer Park Refining Limited Partnership), Deer Park, TX. 312,500 bpd crude capacity (EIA-820). Injects into Colonial Pipeline and Magellan Midstream; reaches 70 delivery points and 191 terminals by published tariff. Crude supply, outlets, events.

- Location: Deer Park, TX
- Status: active
- Crude capacity: 312,500 bpd (EIA-820)
- Operator: Deer Park Refining Limited Partnership (branded 'Pemex Deer Park')
- Parent: Petroleos Mexicanos (Pemex)

## Pipelines it injects into
- Colonial Pipeline at Houston (Pasadena, Cedar Bayou) (research) — https://newtide.ai/supply/pipeline/colonial-pipeline/
- Magellan Midstream at Deer Park Jct. (Shell Deer Park refinery) (confirmed) — https://newtide.ai/supply/pipeline/magellan-midstream/

## Reach by published tariff route
| Pipeline | Delivery points | Terminals | Lowest ¢/bbl | Median ¢/bbl |
|---|---|---|---|---|
| Colonial Pipeline | 70 | 303 | 77.52 | 167.26 |

## Reach by barge (inferred)
47 terminals supplied by barge from docks on Houston Ship Channel / Gulf ICW, in 10 rack markets.

## Crude supply
- pipeline: Enterprise crude pipelines (24-inch and 30-inch) — The US Department of Energy's 2025 Strategic Petroleum Reserve distribution schematic draws Enterprise 24-inch and 30-inch crude lines between the Enterprise Houston Ship Channel terminal and the refinery. The connection is read from a drawing, not from a tariff.
- pipeline: Energy Transfer 16-inch crude line — The US Department of Energy's 2025 Strategic Petroleum Reserve distribution schematic draws an Energy Transfer 16-inch line from the HFOTCO terminal into the refinery. The connection is read from a drawing, not from a tariff.
- pipeline: ONEOK Houston crude distribution lines (two 24-inch) — The US Department of Energy's 2025 Strategic Petroleum Reserve distribution schematic draws two ONEOK 24-inch lines from Speed Junction into the refinery. The same drawing feeds Speed Junction from Seaway Galena Park, ONEOK East Houston and Genoa Junction. The connection is read from a drawing, not from a tariff.
- marine: Houston Ship Channel — Deer Park refinery is sited directly on the Houston Ship Channel with its own marine terminal.

## Product outlets
- pipeline: Sinco Pipeline — Edgewater Midstream's September 2024 release describes the Sinco system as intrastate refined products lines connecting the Deer Park refinery complex to the Colex East and Colex West terminals and to other terminals on the Houston Ship Channel. The same release says the Colex terminals connect to Colonial Pipeline at its origin and to Explorer Pipeline. Colonial and Explorer are reached through Colex, not directly from the plant. Grades are not listed.
- pipeline: Magellan Pipeline — Magellan Pipeline Company Texas No. 73.10.0, effective July 1, 2026, sets a special handling charge for petroleum products moved from its Deer Park Jct. connection with the line that originates at the refinery into East Houston Station. The tariff calls the connecting line Shell Pipeline and does not break out grades.
- marine: Houston Ship Channel — Refinery has its own marine terminal on the Houston Ship Channel.
- barge: Houston Ship Channel / Gulf ICW — Standard barge distribution mode for HSC-sited refineries.
- terminal: Lbc Houston L.p. — LBC Houston is a Houston Ship Channel liquid-bulk storage terminal; geographic proximity makes a connection plausible, but no source confirms a direct link to Deer Park.
- terminal: Deer Park Refining Limited Partners (IRS terminal T-76-TX-2877) — IRS terminal T-76-TX-2877 is registered to Deer Park Refining Limited Partners at 5900 Highway 225, the refinery's own address. It was formerly listed as Shell Oil Products US - Deer Park Rail Tanks. It is the refinery's own registered terminal, not a separate neighbouring facility.
- pipeline: Colonial Pipeline — Colonial's Texas origin/injection point is the Pasadena/Houston area; Deer Park-area refineries are standard suppliers, but no source names Deer Park specifically.

## Recent events
- 2025 — Pemex completed a roughly $380 million reliability turnaround during 2024-2025, the largest at the site in a decade, upgrading distillation, cracking and environmental-control infrastructure; utilization returned to about 91% of nameplate capacity afterward.
- 2024-10-10 — Fatal hydrogen sulfide release from the refinery's amine regeneration unit during maintenance work caused two fatalities; mitigated within about 3 hours. Subsequent CSB investigation cited inadequate equipment labeling and procedural failures.
- 2024 — Refinery recorded 6.5% unscheduled shutdown time in 2024, the highest since 2017, and reported its first annual net loss under Pemex ownership (a deficit of about 860 million pesos).

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/deer-park-refining-lp-deer-park-tx/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.