# Kuparuk Unit Topping Plant (KUTP) / Central Processing Facility 1 (CPF-1)

Kuparuk Unit Topping Plant (KUTP) / Central Processing Facility 1 (CPF-1), Prudhoe Bay, AK. 15,000 bpd crude capacity (EIA-820). Crude supply, outlets, events.

- Location: Prudhoe Bay, AK
- Status: active
- Crude capacity: 15,000 bpd (EIA-820)
- Operator: ConocoPhillips Alaska, Inc.
- Parent: ConocoPhillips

## Crude supply
- pipeline: Direct feed from Kuparuk Central Processing Facility 1 (CPF-1) — The plant is designed to process pipeline-quality crude oil from CPF-1, on the same pad. No merchant crude pipeline or dock is involved. The state's 2007 report gives a feed of about 14,500 barrels per day.

## Product outlets
- pipeline: CPF-1 to CPF-3 diesel pipeline — A new pipeline moves untreated diesel from the CPF-1 topping plant to the CPF-3 ULSD unit for sulfur stripping.
- truck_rack: ConocoPhillips Alaska, Inc. Kuparuk storage and distribution facility (IRS terminal T-92-AK-4578) — The state's 2007 report says the arctic heating fuel is transferred to a storage facility where the various users can take delivery. The IRS lists terminal T-92-AK-4578 for ConocoPhillips Alaska, Inc. at coordinates on the CPF-1 pad. No source read describes the loading equipment or states that the plant's own output leaves by truck.

## Recent events
- 2007-01 — As planned in January 2007, BP and ConocoPhillips were to co-own one ultra-low-sulfur diesel plant at Kuparuk CPF-3, treating diesel from the CPF-1 topping plant. Modules were to arrive on the 2008 summer sealift and the facility was to be in operation at the end of 2008. The actual start-up date is not confirmed.
- 2004-02-28 — About 1,600 gallons of naphtha were released at the CPF-1 topping unit after a tubing failure in the overhead condenser. The unit was shut down for repairs estimated at 7 to 10 days, and diesel was delivered from Fairbanks in the interim.

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/refinery/conocophillips-alaska-inc-prudhoe-bay-ak/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.