Supply Explorer
Fuels refinery

Kuparuk Unit Topping Plant (KUTP) / Central Processing Facility 1 (CPF-1)

ConocoPhillips Alaska, Inc. · ConocoPhillips · Prudhoe Bay, AK

Operating PADD5 IRS refinery no. R-92-AK-0002 distillate
Aerial view of the site Imagery: USDA, USGS The National Map (public domain)
bpd crude capacity · EIA 2026
15,000
pipelines it injects into
0
delivery points reachable
0
terminals on those points
0
events on record
2

Capability

Crude distillation 15,000 bpd operable, 15,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.

Crude slate

Kuparuk River Unit crude oil after processing at CPF-1 (pipeline-quality crude).

Crude in & products out

From refinery research; each row links its source.
DirectionModeRoutePoint / originProductsSource
crude in pipeline Direct feed from Kuparuk Central Processing Facility 1 (CPF-1)
The plant is designed to process pipeline-quality crude oil from CPF-1, on the same pad. No merchant crude pipeline or dock is involved. The state's 2007 report gives a feed of about 14,500 barrels per day.
Kuparuk River Unit production, after processing at CPF-1 crude source
products out pipeline CPF-1 to CPF-3 diesel pipeline
A new pipeline moves untreated diesel from the CPF-1 topping plant to the CPF-3 ULSD unit for sulfur stripping.
Kuparuk CPF-3 ULSD treating facility distillate source
products out truck rack ConocoPhillips Alaska, Inc. Kuparuk storage and distribution facility (IRS terminal T-92-AK-4578)
The state's 2007 report says the arctic heating fuel is transferred to a storage facility where the various users can take delivery. The IRS lists terminal T-92-AK-4578 for ConocoPhillips Alaska, Inc. at coordinates on the CPF-1 pad. No source read describes the loading equipment or states that the plant's own output leaves by truck.
Kuparuk CPF-1 distillate source

Pipeline reach

No tariff origin point is linked to this refinery yet.

Substitutes

No other refinery shares a tariff system with this one in our data.

Events

Outages, fires, turnarounds, sales and closures — newest first.
  1. 2007-01 expansion

    As planned in January 2007, BP and ConocoPhillips were to co-own one ultra-low-sulfur diesel plant at Kuparuk CPF-3, treating diesel from the CPF-1 topping plant. Modules were to arrive on the 2008 summer sealift and the facility was to be in operation at the end of 2008. The actual start-up date is not confirmed. source

  2. 2004-02-28 outage

    About 1,600 gallons of naphtha were released at the CPF-1 topping unit after a tubing failure in the overhead condenser. The unit was shut down for repairs estimated at 7 to 10 days, and diesel was delivered from Fairbanks in the interim. source

Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.