ConocoPhillips Alaska, Inc. · ConocoPhillips · Prudhoe Bay, AK
Crude distillation 15,000 bpd operable, 15,000 operating (EIA-820, as of 2026-01-01). Downstream units below, barrels per calendar day.
Kuparuk River Unit crude oil after processing at CPF-1 (pipeline-quality crude).
| Direction | Mode | Route | Point / origin | Products | Source |
|---|---|---|---|---|---|
| crude in | pipeline | Direct feed from Kuparuk Central Processing Facility 1 (CPF-1) The plant is designed to process pipeline-quality crude oil from CPF-1, on the same pad. No merchant crude pipeline or dock is involved. The state's 2007 report gives a feed of about 14,500 barrels per day. |
Kuparuk River Unit production, after processing at CPF-1 | crude | source |
| products out | pipeline | CPF-1 to CPF-3 diesel pipeline A new pipeline moves untreated diesel from the CPF-1 topping plant to the CPF-3 ULSD unit for sulfur stripping. |
Kuparuk CPF-3 ULSD treating facility | distillate | source |
| products out | truck rack | ConocoPhillips Alaska, Inc. Kuparuk storage and distribution facility (IRS terminal T-92-AK-4578) The state's 2007 report says the arctic heating fuel is transferred to a storage facility where the various users can take delivery. The IRS lists terminal T-92-AK-4578 for ConocoPhillips Alaska, Inc. at coordinates on the CPF-1 pad. No source read describes the loading equipment or states that the plant's own output leaves by truck. |
Kuparuk CPF-1 | distillate | source |
No tariff origin point is linked to this refinery yet.
No other refinery shares a tariff system with this one in our data.
As planned in January 2007, BP and ConocoPhillips were to co-own one ultra-low-sulfur diesel plant at Kuparuk CPF-3, treating diesel from the CPF-1 topping plant. Modules were to arrive on the 2008 summer sealift and the facility was to be in operation at the end of 2008. The actual start-up date is not confirmed. source
About 1,600 gallons of naphtha were released at the CPF-1 topping unit after a tubing failure in the overhead condenser. The unit was shut down for repairs estimated at 7 to 10 days, and diesel was delivered from Fairbanks in the interim. source
Rates are pipeline line-haul transcribed from published FERC tariffs; every figure cites its tariff and item. Cost to serve (netback) adds origin spot price and destination fees. "Confirmed" links match a tariff delivery point to the facility; "same city" means the point is in the facility's city — plausible, not proof; "per research" means the facility's research profile names the pipeline as an outlet.