# Hankinson Renewable Energy ethanol plant, Hankinson, ND

Hankinson Renewable Energy fuel ethanol plant, Hankinson, ND. 170 million gallons a year (11,089 b/d), #10 of 189 U.S. plants (EIA). 11 fuel terminals within 150 miles, 10 with ethanol handling on record; 10 other plants within 100 miles.

- Capacity: 170 million gallons/year (11,089 b/d), EIA As of January 1, 2026
- Rank: #10 of 189 U.S. fuel ethanol plants; 5 plants in ND
- Position: EIA ethanol plant layer (Jan 2023)

## Fuel terminals within 150 miles
- NuStar Pipeline Operating Partnership L.P.- Moorhead, MN (T-41-MN-3400), Moorhead, MN — 55.2 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-41-MN-3400/
- Magellan Pipeline Company, L.P. (T-45-ND-3501), West Fargo, ND — 55.9 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-45-ND-3501/
- Magellan Pipeline Company, L.P. (T-41-MN-3412), Alexandria, MN — 72.3 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-41-MN-3412/
- Magellan Pipeline Company, L.P. (T-46-SD-3555), Watertown, SD — 82.4 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3555/
- NuStar Pipeline Operating Partnership L.P. - Aberdeen, SD (T-46-SD-3550), Aberdeen, SD — 87.9 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3550/
- NuStar Pipeline Operating Partnership L.P. - Sauk Centre, MN (T-41-MN-3401), Sauk Centre, MN — 94 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-41-MN-3401/
- NuStar Pipeline Operating Partnership L.P. - Jamestown, ND (T-45-ND-3503), Jamestown, ND — 103.2 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-45-ND-3503/
- NuStar Pipeline Operating Partnership L.P. - Jamestown, ND (T-45-ND-3502), Jamestown, ND — 112.1 mi — https://newtide.ai/supply/terminal/T-45-ND-3502/
- Magellan Pipeline Company, L.P. (T-41-MN-3414), Marshall, MN — 123.6 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-41-MN-3414/
- Magellan Pipeline Company, L.P. (T-45-ND-3500), Grand Forks, ND — 129.3 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-45-ND-3500/
- NuStar Pipeline Operating Partnership L.P. - Wolsey, SD (T-46-SD-3556), Wolsey, SD — 140.1 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3556/

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/ethanol/ethanol-hankinson-renewable-energy-hankinson-nd/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-27.
