# Glacial Lakes Energy LLC ethanol plant, Mina, SD

Glacial Lakes Energy LLC fuel ethanol plant, Mina, SD. 162 million gallons a year (10,568 b/d), #16 of 189 U.S. plants (EIA). 10 fuel terminals within 150 miles, 6 with ethanol handling on record; 6 other plants within 100 miles.

- Capacity: 162 million gallons/year (10,568 b/d), EIA As of January 1, 2026
- Rank: #16 of 189 U.S. fuel ethanol plants; 16 plants in SD
- Position: EIA ethanol plant layer (Jan 2023)

## Fuel terminals within 150 miles
- NuStar Pipeline Operating Partnership L.P. - Aberdeen, SD (T-46-SD-3550), Aberdeen, SD — 13.9 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3550/
- NuStar Pipeline Operating Partnership L.P. - Wolsey, SD (T-46-SD-3556), Wolsey, SD — 75.2 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3556/
- Magellan Pipeline Company, L.P. (T-46-SD-3555), Watertown, SD — 91.2 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-46-SD-3555/
- NuStar Pipeline Operating Partnership L.P. - Jamestown, ND (T-45-ND-3503), Jamestown, ND — 98.3 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-45-ND-3503/
- NuStar Pipeline Operating Partnership L.P. - Jamestown, ND (T-45-ND-3502), Jamestown, ND — 100.4 mi — https://newtide.ai/supply/terminal/T-45-ND-3502/
- Nustar Pipeline Operating Partnership, L.p. - Mitchell (T-46-SD-3551), Mitchell, SD — 127.4 mi — https://newtide.ai/supply/terminal/T-46-SD-3551/
- Magellan Pipeline Company, L.P. (T-45-ND-3501), West Fargo, ND — 134.7 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-45-ND-3501/
- BNSF - Mandan (T-45-ND-3506), Mandan, ND — 136 mi — https://newtide.ai/supply/terminal/T-45-ND-3506/
- NuStar Pipeline Operating Partnership L.P.- Moorhead, MN (T-41-MN-3400), Moorhead, MN — 138.5 mi, ethanol per operator — https://newtide.ai/supply/terminal/T-41-MN-3400/
- Tesoro Logistics Operations LLC (T-45-ND-3505), Mandan, ND — 139.8 mi — https://newtide.ai/supply/terminal/T-45-ND-3505/

---
Source: Newtide Supply Explorer — https://newtide.ai/supply/ethanol/ethanol-glacial-lakes-energy-llc-mina-sd/
Built from published FERC pipeline tariffs, EIA-820, the IRS Terminal Control Number list and sourced research. Rates are line-haul only. Cite as: Newtide, Supply Explorer, 2026-11-26.
